TECHNET Archives

February 1998

TechNet@IPC.ORG

Options: Hide Table of Contents

¨t²Î¦^«H (2 Messages)
(Fwd) Gold Plated Edge Connectors (2 Messages)
(Fwd) Gold Plated Edge Connectors -Reply -Forwarded (1 Message)
(TN): Stressed/Fractured Joint (1 Message)
: Burr (1 Message)
: Query on IPC-A-61 (1 Message)
: Query on IPC-A-610, Rev. B (1 Message)
<No subject given> (1 Message)
<No subject given> (Stepper exposure systems) (1 Message)
<No subject> (31 Messages)
acceptance of pwb (1 Message)
Acid etching Causes and remedies for PCB industry (2 Messages)
address correction (1 Message)
ADMIN: Some useful commands and options (1 Message)
Administrative Reply to [TN] Release: DPO - IPO "How To" Tools (1 Message)
Administrative Reply: [TN] Tell me? Could Pcaster (1 Message)
Again-Most weird problem: Solder between epoxy & fab or epoxy & comp (1 Message)
Again-Most weird problem: Solder between epoxy & fab orepoxy &comp (1 Message)
Air Ion Level Measurement (2 Messages)
Alpha Metals Ionograph 500M Chemical Verification (3 Messages)
Alphametals (3 Messages)
Alphametals -Reply (1 Message)
announcement (1 Message)
ANSI-J-001 and IPC610 (1 Message)
applied to the boards (1 Message)
Article on PCB Warping (5 Messages)
Artwork Scanner (3 Messages)
ASM: Manual Assembly Houses (2 Messages)
ass'y: conformal coating contractor needed (2 Messages)
Assembly (1 Message)
Assembly Forum ??? (1 Message)
ASSY : HAND CLEANING (1 Message)
Assy: (BGAs + FPGA)/(BGAs) (2 Messages)
ASSY: Castellated (4 Messages)
ASSY: Castellated -Reply (1 Message)
ASSY: Castellated-corrected copy (1 Message)
Assy: FlipChip Microvia forum at NEPCON (1 Message)
ASSY: HAND CLEANING (3 Messages)
Assy: Other Sources for Thermocouples (6 Messages)
Assy: PBGAs (7 Messages)
ASSY: SIR test on post wave soldering / touch - up operations. (1 Message)
Assy: Solder Paste Height Measurement (9 Messages)
ASSY: Waffle Trays (1 Message)
assy:fiducials (4 Messages)
ASSY:PVA equipment (1 Message)
ASSY:Solder-On-Gold-Fingers (1 Message)
ASY/DES: Cam Software selection (2 Messages)
Atotech Black oxide (3 Messages)
Automotive PFMEA for electronics assembly (4 Messages)
Automotive PFMEA for electronics assembly -Reply (1 Message)
Auxiliary ventilation for wave soldering equipment (1 Message)
Bare board witness marks and their effect on the assembly stage (1 Message)
Barrel Cracking (1 Message)
BGA Interposer cards (2 Messages)
BGA question (3 Messages)
BGA Rework (5 Messages)
Black Oxide-rinses (2 Messages)
Black Oxide-rinses -Reply (2 Messages)
Bond Testing Equipment (3 Messages)
bright copper plating of PCB with no small (1-5um)nodule (2 Messages)
CAD Software (2 Messages)
CALL FOR PAPERS - 12th European Microelectronics (1 Message)
cam software (1 Message)
Carbamate Formation In Cyanate Ester Resin (1 Message)
CCA Statewide Conference (2 Messages)
CEM-1 Laminate - Edge Treatment (1 Message)
Change in Technet message format (2 Messages)
Change new add (1 Message)
Chip On Board (2 Messages)
Chip Scale International 98 - CALL FOR PAPERS - May 5-7, 1998 - Santa Clara Convention Center (5 Messages)
Circuit board repair kits (1 Message)
Cleanliness Test (3 Messages)
Coating over No-Clean (1 Message)
Component Marking Ink (2 Messages)
Component Reliability Database (5 Messages)
Concerns with Alpha Metals SLS65 no-clean flux (3 Messages)
Confirmation of Receipt (1 Message)
Conflict in Requirement (2 Messages)
Conformal Coat adhesion testing? (2 Messages)
Conformal coating cure for Dow Corning 2577 and 3-1765 (6 Messages)
Consultant or expert in conformal coating of PCBs. (3 Messages)
Controlled Impedance of a Backplane ... (1 Message)
Convection Oven (2 Messages)
coper oxide growth (2 Messages)
copper (2 Messages)
copy requests (2 Messages)
Correction to FSL fax no (2 Messages)
Corrosion after electroless tin finish (2 Messages)
corrosivity HASL v GOLD (2 Messages)
coupons (2 Messages)
CPCA 1998 (1 Message)
CTI Voltage (1 Message)
Cure acceleration with CO2, Humidity and Heat (1 Message)
Curing with CO2, humidity and heat. (1 Message)
Dark brown residue (1 Message)
Depression mark during soldermask exposing (4 Messages)
DES: Hole sizes for non-auto-insertable parts (3 Messages)
DES: Impedance software (1 Message)
Design over 1GHz (3 Messages)
Design: Use of Silver Filled Epoxy as Reference Plane (1 Message)
Dessicant Chamber (6 Messages)
Dielectric constants (10 Messages)
Dow 3-1765 cure (2 Messages)
Drilling of Holes (2 Messages)
Drum level alarms (6 Messages)
Dual Lane Processing (2 Messages)
Electrical Isolation Properties of Multilayer PCB's (5 Messages)
Electrical Test Definitions for IPC-ET-652 (1 Message)
Electrical Test Workshop (1 Message)
electrodep Cu foil vs. RA foil (6 Messages)
electroless Ni/Au soft/hard (2 Messages)
Entek Plus coating thickness (3 Messages)
Equinox International. (1 Message)
Expereinced PCB Sales Reps (1 Message)
FAB - Gold consumption rates (3 Messages)
FAB, Test Coupons (2 Messages)
FAB: Barrel Cracking MC-3D material (2 Messages)
FAB: cross section docs (1 Message)
Fab: Drill Bits (3 Messages)
FAB: Process controls for drilling (2 Messages)
FAB: Pure Gold Process (1 Message)
FAB; Subject: Very Fine Line (1 Message)
FBGA design (1 Message)
Fillet Height (1 Message)
Fine Line Search (1 Message)
fine pitch testing (1 Message)
Flipchip placement equip (1 Message)
Flipchip placement equip -Reply (1 Message)
Florida Cirtech (2 Messages)
FMEA means what? (4 Messages)
FS: electrovert 500C (1 Message)
GEB Laminate (1 Message)
Gen: Axarel supplier (4 Messages)
GEN: Greater Boston DC chapter meeting 2/18 (1 Message)
GEN: on the passing of a friend (1 Message)
GEN: Short course in UK on Electronic Manufacturing (1 Message)
Gerber Software (2 Messages)
GLASS ARTWORK (2 Messages)
Glue dispenser machine v/s stencil printing (6 Messages)
Glue on solder mask (1 Message)
Gold for edge-board connectors thickness (10 Messages)
gold over entire board (12 Messages)
Gold plating b/4 or after hal (1 Message)
Gold plating switch contacts (4 Messages)
Gold surface finish (3 Messages)
HASL solder specs (1 Message)
Help on drying boards (3 Messages)
Hi James, (1 Message)
High-Frequency Dielectric Constant (4 Messages)
How to treat a PWB ??? (2 Messages)
I need .059 1/1 or 1/0 GE CEM3 or AL910 laminate (2 Messages)
I'm looking to find a tranning course for PCB design & layout (3 Messages)
IC Adapters (2 Messages)
Immersion Tin (3 Messages)
Impedance Software (1 Message)
Information on learning curves. (1 Message)
Information on Silver Terminals (4 Messages)
IPC Designers Council Meeting (Atlanta Chapter) (1 Message)
IPC-610 (2 Messages)
IPC-CF-150E (1 Message)
IPCchat session announcement (4 Messages)
J-STD-001B Cleaning Call out (1 Message)
jdec trays (3 Messages)
Kapton Etching (4 Messages)
Kevlar reinforced laminate or prepreg (4 Messages)
Laminate Identification (1 Message)
Laminate surface abrasion (2 Messages)
Lamination Presses Input (2 Messages)
Laser via in pad (2 Messages)
Leaching of Gold into a solder pot? (5 Messages)
Leaching of Gold into a solder pot? -Reply (1 Message)
LEAD SPOT TEST (2 Messages)
Looking for Equipment (2 Messages)
looking for soldermask manufacturer (2 Messages)
Manufacturers Rep's Wanted (3 Messages)
Mating Tin / Gold; SIMMs and sockets (4 Messages)
metal sludge reduction (7 Messages)
MICROSCOPE REPAIRS (2 Messages)
MICROSCOPE REPAIRS -Reply (1 Message)
Microsection of Microvias (1 Message)
Microsections (3 Messages)
MicroVia info, San Diego IPC Chapter (1 Message)
Min. Annular Ring (4 Messages)
Modeling a IR reflow oven (3 Messages)
Moisture Cure for Conformal Coatings (3 Messages)
Moisture Cure for Conformal Coatings -Svar (1 Message)
Moisture Sensitive Parts (3 Messages)
Moisture Sensitivity (1 Message)
Most weird problem: Solder between epoxy & fab or epoxy & (1 Message)
Most weird problem: Solder between epoxy & fab or epoxy & comp (5 Messages)
MTBF (1 Message)
National PWB Resource Center (1 Message)
Need inexpensive method of glueing parts on PCB (2 Messages)
Nickel,Gold&solder masks (4 Messages)
NON-THERMALLY RELIEVED VIAS- ring voids (4 Messages)
NON-THERMALLY RELIEVED VIAS- ring voids -Reply (4 Messages)
NON-THERMALLY RELIEVED VIAS- ring voids -Reply -Reply (1 Message)
Omikron Immersion White Tin (2 Messages)
ORGANIC COATING(PRE-FLUX) THICKNESS MEASUREMEN (3 Messages)
OSP coating and soldermask (1 Message)
OSP Stain (3 Messages)
Paco Via Material (1 Message)
pad lifting / pad rotation (2 Messages)
pad lifting / pad rotation -Reply (2 Messages)
panel yield on back plane (2 Messages)
Panelization (4 Messages)
PBGA rework with paste? (1 Message)
PCB ASSEMBLER (1 Message)
PCB cut-out (5 Messages)
PCB desoldering (3 Messages)
PCB Laminate FAQ - need support! (3 Messages)
PCB Milling machines (2 Messages)
PCB Prototype Facility setup (3 Messages)
PCB Prototype Machine (2 Messages)
PCB Supplier (2 Messages)
PCB warpage (33 Messages)
PCB warpage - Reply (3 Messages)
PCB warpage -Reply (7 Messages)
Placement system (1 Message)
Plating Rectifier setup (2 Messages)
Polyimide (1 Message)
Polyimide and BT material (2 Messages)
polyimide damage after peroxide etching (1 Message)
Pre-stamped soldermask (1 Message)
pre-wave masking (3 Messages)
Precision Valve and Automation (1 Message)
Precision Valve and Automation -Reply (1 Message)
Press wanted (1 Message)
Probing on fine picht SMD leads (2 Messages)
Probing on fine pitch SMD leads (2 Messages)
Problem with new XZ17B Coates solder resist catalyst (1 Message)
Problems due to prepregs selection & it's fix (2 Messages)
Production Management in PCB shops (1 Message)
Pull Strengths (1 Message)
Purchase of used Microscopes (3 Messages)
PWB Cost (1 Message)
PWB COSTING (1 Message)
PWB punching tool life (2 Messages)
Quality Labels ? (2 Messages)
Question : "Crackling" noise in boards post SMT (4 Messages)
Questions Regarding Castellations on a MCM (1 Message)
Re : [TN] Circuit board repair kits (3 Messages)
Re Air Ion Level Measurement (1 Message)
Re J/STD/A-610 (1 Message)
Release: DPO - IPO "How To" Tools (2 Messages)
Reliability vs Inner Layer break Out (1 Message)
Reply Error (1 Message)
RF Plasma tool (1 Message)
RF Plasma tool -Reply (1 Message)
RMA vs. No Clean for BGA (1 Message)
Roku-Roku Sangyo, Ltd. (1 Message)
Roughness plating (2 Messages)
RP machine (1 Message)
San Diego Chapter of the IPC Designer Council (1 Message)
San Diego Chapter of the IPC Designers Council (2 Messages)
SEARCH warpage (1 Message)
single-sided solder requirements (1 Message)
SIR Testing for BGAs and CSPs (3 Messages)
SM Lead dimension specification (3 Messages)
Small holes, Thick Boards & Hole Reliability (1 Message)
SMEMA Specifications (2 Messages)
SNEC meeting (1 Message)
solder balling (2 Messages)
Solder balls spec (4 Messages)
Solder Joint wetting (3 Messages)
Solder Paste Inspection R & R Study (1 Message)
Solder Paste Printing Process (2 Messages)
Solder paste relaxation/characteristic time (1 Message)
Solder paste relaxation/characteristic time -Reply (2 Messages)
Solder Requirements for Chip Scale BGA's (4 Messages)
solder shear strength (3 Messages)
Solder-on-Gold Fingers (1 Message)
Solderability od alloy 42 (2 Messages)
Solderability of alloy 42 (1 Message)
Solderball connection (1 Message)
soldermask (1 Message)
Soldermask developing (6 Messages)
Soldermask foil (1 Message)
SolderMask Types (4 Messages)
SOURCE FOR SCREEN MESH CLOTH & EMULSION (4 Messages)
Spare part for spray fluxer (1 Message)
Specifications (3 Messages)
Specifications for cable assemblers (1 Message)
Specs on Board Warpage (1 Message)
strange word (5 Messages)
Subscribe (4 Messages)
SUPPLIER EVALUATION AND QUALIFICATION (1 Message)
Surface Finishes (6 Messages)
survey report (2 Messages)
suspended particle specifications (1 Message)
TechNet Digest - 2 Dec 1997 to 3 Dec 1997 (1 Message)
TechNet Forum....Is it just me? (8 Messages)
Technet Subscription (1 Message)
Tell me? Could Pcaster Make YOU $70,000 per Month on the NET? (1 Message)
Temporary Soldermask (2 Messages)
Temproary resist for immersion gold (1 Message)
Temproary resist for immersion gold -Reply (1 Message)
test (1 Message)
TN : Explain me about "Nodules" (1 Message)
TN Automatic evaluation of microsections (1 Message)
To On or Not to On (5 Messages)
To On or Not to On -Reply (3 Messages)
To On or Not to On -Reply -Reply (9 Messages)
To On or Not to On : Feedback (1 Message)
To On or Not to On : Thank you all (1 Message)
Tonites meeting is CANCELLED (2 Messages)
tracking assemblies (1 Message)
Training course(s)... (1 Message)
Transformer Adhesive (1 Message)
UL APPROVAL (BUILDUP PCB) (2 Messages)
Un-subscribe (3 Messages)
unsubscribe (2 Messages)
Use of Compliant pin connectors on RF material backplane (1 Message)
Use of Heat, Humidity, CO2 to Accelerate Conformal Coating Process (1 Message)
Used Optek DPL? (1 Message)
v-score depanelling tool (5 Messages)
V-scored Panel Boards (3 Messages)
Very Fine Line (5 Messages)
Vias in SMT pads (3 Messages)
Vias in SMT pads -Reply (3 Messages)
Vias Surface Mount Lands (1 Message)
Video Micrometer (1 Message)
virus alert - NO TECHNET COMMENTS ON THIS HOAX, PLEASE (1 Message)
virus alert -Forwarded (2 Messages)
Virus Alerts (2 Messages)
Voids in PTH joints (1 Message)
wavesoldering (To On or Not to On : Feedback -Reply) (1 Message)
Wet Process Equipment in Asia (3 Messages)
What can I use to clean my boards after rework if I am (1 Message)
What can I use to clean my boards after rework if I am in NO -CLEAN Tech.?????? (2 Messages)
What can I use to clean my boards after rework if I am in NO-CLEAN Tech.?????? (2 Messages)
What is the advantage of brass coated Cu foil? (1 Message)
What is the home address of TechNet (3 Messages)
Whiskers with Sn99.3 (3 Messages)
Whiskers with Sn99.3/unfused PbSn PWB plating (1 Message)
Why DI - lowest cost DI quality (1 Message)
Why DI? (3 Messages)
Why DI? -Reply (1 Message)
WIREBONDING WIRE AGE (1 Message)
Work factor (3 Messages)
X-Sectioning Boards with Micro Vias (3 Messages)
[ASSY} Prebake (2 Messages)
[ASSY} Prebake -Reply (2 Messages)
[CN] IPCchat session announcement (1 Message)
[Fwd: North Texas Chapter ~ IPC Designers Council Meeting March 5th @ 6:30PM] (1 Message)
[TN] (Fwd) Gold Plated Edge Connectors (1 Message)
[TN] Alpha Metals Ionograph 500M Chemical Verification (1 Message)
[TN] Chip On Board (1 Message)
[TN] Component Marking Ink (1 Message)
[TN] F&K & ASM equipment feedback (1 Message)
[TN] Gerber Software (2 Messages)
[TN] Glue dispenser machine v/s stencil printing (1 Message)
[TN] Gold for edge-board connectors thickness (1 Message)
[TN] gold over entire board (2 Messages)
[TN] Microsections (1 Message)
[TN] ORGANIC COATING(PRE-FLUX) THICKNESS MEASUREMEN (4 Messages)
[TN] ORGANIC COATING(PRE-FLUX) THICKNESSMEASUREMEN (1 Message)
[TN] PCB warpage (1 Message)
[TN] Soldermask developing (8 Messages)
[TN] Stencil Aperture Shapes -Reply (1 Message)
[TN] v-score depanelling tool (1 Message)
] Design over 1GHz (2 Messages)

Subject Sorted by Subject, Most Recent First

From

Date

New Thread ¨t²Î¦^«H
leelam
Fri, 27 Feb 1998 08:36:22 +0800
Francisco Brice $B!" (Jo / Molex de M $B#Y (Jico
Fri, 27 Feb 1998 10:10:08 -0600
New Thread (Fwd) Gold Plated Edge Connectors
John Parsons
Thu, 5 Feb 1998 08:48:04 +0000
Graham Naisbitt
Fri, 6 Feb 1998 00:05:35 -0000
New Thread (Fwd) Gold Plated Edge Connectors -Reply -Forwarded
Matthew Park
Thu, 5 Feb 1998 13:58:35 -0800
New Thread (TN): Stressed/Fractured Joint
Poh Kong Hui
Fri, 20 Feb 1998 06:21:50 +0800
New Thread : Burr
Poh Kong Hui
Wed, 4 Feb 1998 23:14:18 +0800
New Thread : Query on IPC-A-61
JOHN OSULLIVAN
Mon, 9 Feb 1998 08:22:16 -0400
New Thread : Query on IPC-A-610, Rev. B
Poh Kong Hui
Sat, 7 Feb 1998 23:18:48 +0800
New Thread <No subject given>
Jay Soderberg
Tue, 3 Feb 1998 07:25:13 -0600
New Thread <No subject given> (Stepper exposure systems)
Robert E. Mesick
Thu, 19 Feb 1998 08:57:09 +0000
New Thread <No subject>
<>
Mon, 2 Feb 1998 16:31:28 -0800
<>
Mon, 2 Feb 1998 16:31:28 -0800
Werner Engelmaier
Mon, 2 Feb 1998 16:58:52 -0800
Werner Engelmaier
Mon, 2 Feb 1998 16:59:06 -0800
Werner Engelmaier
Mon, 2 Feb 1998 16:59:06 -0800
Werner Engelmaier
Mon, 2 Feb 1998 16:58:52 -0800
<>
Mon, 2 Feb 1998 18:10:15 EST
Ron Hayashi
Tue, 3 Feb 1998 02:20:14 -0800
Ron Hayashi
Tue, 3 Feb 1998 02:20:14 -0800
Richard MacCutcheon
Tue, 3 Feb 1998 02:21:42 -0800
Joe Felts
Tue, 3 Feb 1998 02:24:38 -0800
Richard MacCutcheon
Tue, 3 Feb 1998 02:21:42 -0800
Joe Felts
Tue, 3 Feb 1998 02:24:38 -0800
Annie Laberge
Tue, 3 Feb 1998 02:47:17 -0800
<>
Tue, 3 Feb 1998 02:47:18 -0800
<>
Tue, 3 Feb 1998 02:47:19 -0800
Joseph J. Reichert
Tue, 3 Feb 1998 02:47:20 -0800
Annie Laberge
Tue, 3 Feb 1998 02:47:17 -0800
<>
Tue, 3 Feb 1998 02:47:18 -0800
<>
Tue, 3 Feb 1998 02:47:19 -0800
Joseph J. Reichert
Tue, 3 Feb 1998 02:47:20 -0800
<>
Tue, 3 Feb 1998 02:47:20 -0800
<>
Tue, 3 Feb 1998 02:47:20 -0800
<>
Tue, 3 Feb 1998 02:52:29 -0800
<>
Tue, 3 Feb 1998 02:52:29 -0800
Al Hamilton
Tue, 3 Feb 1998 09:28:05 EST
Stephane Richard
Wed, 11 Feb 1998 09:03:04 -0500
Lou Franzini
Wed, 18 Feb 1998 16:36:15 -0500
Ruben Irizarry
Thu, 19 Feb 1998 08:59:26 -0700
Bev Christian
Thu, 19 Feb 1998 11:11:50 -0500
mross
Thu, 19 Feb 1998 23:31:15 -0500
New Thread acceptance of pwb
E.A. Speer
Thu, 5 Feb 1998 09:39:09 -0500
New Thread Acid etching Causes and remedies for PCB industry
Indal
Thu, 5 Feb 1998 13:07:26 +0500
<>
Thu, 5 Feb 1998 15:09:39 EST
New Thread address correction
Gary Ferrari
Sun, 1 Feb 1998 14:41:42 EST
New Thread ADMIN: Some useful commands and options
Dmitriy Sklyar
Mon, 9 Feb 1998 14:27:10 -0600
New Thread Administrative Reply to [TN] Release: DPO - IPO "How To" Tools
Jack Crawford
Wed, 18 Feb 1998 16:15:15 -0600
New Thread Administrative Reply: [TN] Tell me? Could Pcaster
Jack Crawford
Mon, 23 Feb 1998 14:08:58 -0600
New Thread Again-Most weird problem: Solder between epoxy & fab or epoxy & comp
Ken Patel
Mon, 9 Feb 1998 18:06:07 -0800
New Thread Again-Most weird problem: Solder between epoxy & fab orepoxy &comp
Paul Klasek
Tue, 10 Feb 1998 13:49:22 +1100
New Thread Air Ion Level Measurement
Hew How Chee
Sat, 28 Feb 1998 11:05:52 +0800
Peter Mariani
Sat, 28 Feb 1998 08:16:44 -0500
New Thread Alpha Metals Ionograph 500M Chemical Verification
Irwin, William D
Fri, 13 Feb 1998 09:22:10 -0600
Graham Naisbitt
Sat, 14 Feb 1998 01:31:07 -0000
Karen Tellefsen
Sun, 15 Feb 1998 21:55:36 -0800
New Thread Alphametals
Ed Cosper
Fri, 27 Feb 1998 09:33:34 -0600
ron rawlyk
Fri, 27 Feb 1998 09:52:40 -0600
Karen Tellefsen
Sat, 28 Feb 1998 07:19:37 -0800
New Thread Alphametals -Reply
Ron Hayashi
Fri, 27 Feb 1998 08:40:56 -0800
New Thread announcement
Karl Buschmann
Mon, 2 Feb 1998 16:47:33 -0600
New Thread ANSI-J-001 and IPC610
<>
Wed, 11 Feb 1998 18:06:15 +0000
New Thread applied to the boards
John Haman Jr.
Tue, 3 Feb 1998 08:19:06 PST
New Thread Article on PCB Warping
ETS
Thu, 19 Feb 1998 15:53:29 -0800
Johannes Sivula
Fri, 20 Feb 1998 09:15:45 +0200
Cash, Alan
Fri, 20 Feb 1998 15:39:45 -0500
Andrew Chuong
Fri, 20 Feb 1998 17:52:52 +0000
Afri Singh
Sat, 21 Feb 1998 14:33:28 -0500
New Thread Artwork Scanner
Eric Blazi
Wed, 4 Feb 1998 08:11:40 EST
John Parsons
Wed, 4 Feb 1998 08:27:02 +0000
George Toman
Wed, 4 Feb 1998 14:11:48 -0500
New Thread ASM: Manual Assembly Houses
<>
Wed, 18 Feb 1998 05:55:14 EST
Pete Schumacher
Wed, 18 Feb 1998 15:45:08 -0600
New Thread ass'y: conformal coating contractor needed
Jerry Cupples
Mon, 16 Feb 1998 17:33:52 -0600
Aric Parr
Tue, 17 Feb 1998 07:06:37 EST
New Thread Assembly
Vertefeuille, Russ (AZ77)
Tue, 3 Feb 1998 10:30:58 -0600
New Thread Assembly Forum ???
Achim Neu
Sun, 1 Feb 1998 12:15:26 +0100
New Thread ASSY : HAND CLEANING
Kasprzak, Bill (esd) US
Tue, 24 Feb 1998 07:18:00 PST
New Thread Assy: (BGAs + FPGA)/(BGAs)
Phil Bavaro
Wed, 11 Feb 1998 10:02:31 -0700
Bev Christian
Wed, 11 Feb 1998 13:33:54 -0500
New Thread ASSY: Castellated
<>
Tue, 10 Feb 1998 11:22:30 -0700
Engineering / Design Dept.
Tue, 10 Feb 1998 10:43:04 -0800
Jerry Cupples
Tue, 10 Feb 1998 14:39:35 -0600
Jack Crawford
Tue, 10 Feb 1998 17:28:33 -0600
New Thread ASSY: Castellated -Reply
Christy Graham
Tue, 10 Feb 1998 10:47:24 -0800
New Thread ASSY: Castellated-corrected copy
Jack Crawford
Tue, 10 Feb 1998 17:31:34 -0600
New Thread Assy: FlipChip Microvia forum at NEPCON
David Bergman
Thu, 19 Feb 1998 13:38:55 -0600
New Thread ASSY: HAND CLEANING
Jim Marsico 516-595-5879
Mon, 23 Feb 1998 12:50:00 -0400
Aric Parr
Mon, 23 Feb 1998 13:12:29 EST
Bev Christian
Mon, 23 Feb 1998 15:04:50 -0500
New Thread Assy: Other Sources for Thermocouples
Charles Barker
Tue, 10 Feb 1998 11:10:06 -0600
Long, Jim HSD
Tue, 10 Feb 1998 12:46:39 -0500
Stephen R. Gregory
Tue, 10 Feb 1998 16:06:20 EST
Jerry Cupples
Tue, 10 Feb 1998 13:17:53 -0600
ETS
Tue, 10 Feb 1998 13:32:02 -0800
Charles Barker
Tue, 10 Feb 1998 16:02:37 -0600
New Thread Assy: PBGAs
Blanchet,Richard
Wed, 4 Feb 1998 10:46:00 -0500
Jeff Seeger
Wed, 4 Feb 1998 11:20:11 -0500
Greg Bartlett
Wed, 4 Feb 1998 13:26:52 +0000
Kane, Joseph
Wed, 4 Feb 1998 13:29:16 -0500
Jim Marsico 516-595-5879
Wed, 4 Feb 1998 13:45:00 -0400
Doug Pauls
Thu, 5 Feb 1998 08:34:52 EST
Rod Martens
Thu, 5 Feb 1998 15:10:30 -0700
New Thread ASSY: SIR test on post wave soldering / touch - up operations.
Terry Huddleston
Fri, 13 Feb 1998 15:53:23 -0600
New Thread Assy: Solder Paste Height Measurement
Charles Barker
Tue, 10 Feb 1998 11:06:28 -0600
Jerry Cupples
Tue, 10 Feb 1998 13:09:48 -0600
Stephen R. Gregory
Tue, 10 Feb 1998 16:20:32 EST
Ron Lohrbach
Tue, 10 Feb 1998 18:36:13 -0800
Krishna Kalyan
Wed, 11 Feb 1998 16:33:46 PST
Landes, Jeff
Thu, 12 Feb 1998 09:56:00 PST
Jeffery L. Hempton
Thu, 12 Feb 1998 10:22:19 -0500
Lustig, Steven K..
Thu, 12 Feb 1998 14:37:08 -0500
Bryan Woods
Fri, 13 Feb 1998 08:49:09 -0800
New Thread ASSY: Waffle Trays
Lainie Loveless
Mon, 23 Feb 1998 08:25:01 -0500
New Thread assy:fiducials
Larry Davis
Wed, 18 Feb 1998 15:38:00 -0600
Mikael Blank
Thu, 19 Feb 1998 09:22:51 +0100
Achim Neu
Sun, 22 Feb 1998 11:28:35 +0100
Stephen R. Gregory
Sun, 22 Feb 1998 18:44:01 EST
New Thread ASSY:PVA equipment
Larry Davis
Tue, 10 Feb 1998 10:46:00 -0600
New Thread ASSY:Solder-On-Gold-Fingers
Jeffery L. Hempton
Tue, 3 Feb 1998 09:33:37 -0500
New Thread ASY/DES: Cam Software selection
Mark F. Hanrahan
Sat, 7 Feb 1998 09:08:33 -0500
<>
Sun, 8 Feb 1998 21:06:01 -0500
New Thread Atotech Black oxide
Scott Westheimer-CTUA143
Thu, 19 Feb 1998 18:31:55 -0600
John Haman Jr.
Fri, 20 Feb 1998 08:36:53 PST
<>
Fri, 20 Feb 1998 21:44:24 EST
New Thread Automotive PFMEA for electronics assembly
Ed Holton
Thu, 12 Feb 1998 07:20:25 -0500
Hamilton, Richard -4454
Thu, 12 Feb 1998 10:24:45 -0700
Murphy Steve (UO/ESS)
Thu, 12 Feb 1998 16:41:17 -0500
Dan Stege
Fri, 13 Feb 1998 11:35:09 -0600
New Thread Automotive PFMEA for electronics assembly -Reply
Allan Kerr
Thu, 12 Feb 1998 13:51:47 -0500
New Thread Auxiliary ventilation for wave soldering equipment
Valli Robert
Tue, 24 Feb 1998 13:24:00 -0500
New Thread Bare board witness marks and their effect on the assembly stage
Dudi Banitt
Wed, 25 Feb 1998 08:38:38 +0200
New Thread Barrel Cracking
Steve Collins
Wed, 25 Feb 1998 08:37:49 -0700
New Thread BGA Interposer cards
Marcy, Jenni A
Mon, 9 Feb 1998 08:59:21 -0700
<>
Wed, 11 Feb 1998 18:48:18 EST
New Thread BGA question
Steve Schrader
Fri, 6 Feb 1998 17:26:56 -0500
eric roulo
Fri, 6 Feb 1998 14:53:55 -0800
budster
Fri, 6 Feb 1998 15:37:04 -0800
New Thread BGA Rework
Tom Cooper
Wed, 4 Feb 1998 11:28:17 EST
Shaddock, David M (CRD)
Fri, 6 Feb 1998 11:11:32 -0500
Stephane Richard
Wed, 11 Feb 1998 09:29:15 -0500
MARK McAULEY
Wed, 11 Feb 1998 08:58:23 -0600
Greg Bartlett
Wed, 11 Feb 1998 10:29:23 +0000
New Thread Black Oxide-rinses
Eltek Ltd. - Process Engineering
Wed, 11 Feb 1998 18:40:09 +0200
Eltek Ltd. - Process Engineering
Thu, 12 Feb 1998 08:05:45 +0200
New Thread Black Oxide-rinses -Reply
Fred Johnson
Thu, 12 Feb 1998 14:36:15 +0000
indal
Fri, 13 Feb 1998 11:45:44 +0530
New Thread Bond Testing Equipment
Jeff Wold
Thu, 12 Feb 1998 13:56:33 -0600
David Anderson
Thu, 12 Feb 1998 15:47:49 -0600
Bev Christian
Fri, 13 Feb 1998 08:41:44 -0500
New Thread bright copper plating of PCB with no small (1-5um)nodule
FANG J L
Sun, 22 Feb 1998 11:51:07 +0800
fulabhai
Sat, 21 Feb 1998 21:41:00 -0800
New Thread CAD Software
Modular Components National, Inc.
Tue, 3 Feb 1998 15:36:32 -0500
Ralph Garvin
Tue, 3 Feb 1998 15:25:47 -0600
New Thread CALL FOR PAPERS - 12th European Microelectronics
<>
Thu, 26 Feb 1998 10:28:41 +0000
New Thread cam software
<>
Sun, 8 Feb 1998 16:49:35 -0800
New Thread Carbamate Formation In Cyanate Ester Resin
Lwallig
Sat, 28 Feb 1998 15:36:28 EST
New Thread CCA Statewide Conference
Dennis Maggi
Mon, 2 Feb 1998 01:49:56 EST
Dennis Maggi
Mon, 2 Feb 1998 01:52:10 EST
New Thread CEM-1 Laminate - Edge Treatment
JB
Fri, 6 Feb 1998 11:00:38 +0800
New Thread Change in Technet message format
Shaun Tibbals
Tue, 3 Feb 1998 10:04:22 -0500
David Tyler
Wed, 4 Feb 1998 12:29:55 -0500
New Thread Change new add
<>
Fri, 27 Feb 1998 00:27:57 +0800
New Thread Chip On Board
ssyeo
Fri, 6 Feb 1998 12:07:18 +0800
Stephen R. Gregory
Thu, 5 Feb 1998 23:58:21 EST
New Thread Chip Scale International 98 - CALL FOR PAPERS - May 5-7, 1998 - Santa Clara Convention Center
John Riley
Mon, 2 Feb 1998 11:48:45 -0600
roberto
Tue, 3 Feb 1998 18:00:17 +0200
Michael Parker
Wed, 4 Feb 1998 08:01:30 +0000
Michael Freda
Wed, 4 Feb 1998 08:02:56 -0800
Joseph Fjelstad
Thu, 5 Feb 1998 16:25:57 -0800
New Thread Circuit board repair kits
Lee McCuistion
Fri, 6 Feb 1998 09:52:12 +0000
New Thread Cleanliness Test
Kathy Palumbo
Tue, 17 Feb 1998 11:32:44 -0800
Karen Tellefsen
Tue, 17 Feb 1998 16:16:58 -0500
<>
Tue, 17 Feb 1998 17:02:14 EST
New Thread Coating over No-Clean
<>
Tue, 17 Feb 1998 15:31:32 EST
New Thread Component Marking Ink
Edward Valentine
Wed, 18 Feb 1998 23:08:54 -0800
Scott Decker
Thu, 19 Feb 1998 07:56:29 -0800
New Thread Component Reliability Database
Peroutka, Gregg W.
Thu, 26 Feb 1998 08:45:14 -0600
Paul Terranova
Thu, 26 Feb 1998 10:47:16 -0500
Gerald G. Gagnon
Thu, 26 Feb 1998 10:56:59 -0500
Gregg Klawson
Thu, 26 Feb 1998 11:21:51 -0500
Glenn Pelkey
Thu, 26 Feb 1998 08:54:03 PST
New Thread Concerns with Alpha Metals SLS65 no-clean flux
Chris_Smith
Tue, 17 Feb 1998 09:09:21 -0600
Jerry Cupples
Tue, 17 Feb 1998 10:02:00 -0600
Sergio Nunez
Mon, 16 Feb 1998 10:35:20 -0800
New Thread Confirmation of Receipt
Undetermined origin c/o LISTSERV administrator
Tue, 24 Feb 1998 21:05:25 EST
New Thread Conflict in Requirement
M CURRY
Fri, 6 Feb 1998 17:00:17 -0600
Phillip E. Hinton
Fri, 6 Feb 1998 21:42:54 EST
New Thread Conformal Coat adhesion testing?
Chris_Smith
Thu, 12 Feb 1998 13:00:25 -0600
Graham Naisbitt
Sat, 14 Feb 1998 01:15:34 -0000
New Thread Conformal coating cure for Dow Corning 2577 and 3-1765
Chris_Smith
Tue, 17 Feb 1998 08:09:43 -0600
Aric Parr
Tue, 17 Feb 1998 09:49:20 EST
Sheila Smith
Tue, 17 Feb 1998 10:44:21 -0500
ETS
Tue, 17 Feb 1998 08:23:04 -0800
ETS
Tue, 17 Feb 1998 08:26:48 -0800
Graham Naisbitt
Sat, 21 Feb 1998 12:08:59 -0000
New Thread Consultant or expert in conformal coating of PCBs.
Brian_Maas
Tue, 10 Feb 1998 13:55:19 -0600
ETS
Tue, 10 Feb 1998 13:17:28 -0800
Edward J Popielarski
Wed, 11 Feb 1998 10:22:27 -0600
New Thread Controlled Impedance of a Backplane ...
Doug McKean
Sat, 14 Feb 1998 13:55:23 -0500
New Thread Convection Oven
Brian Husnik
Tue, 17 Feb 1998 16:24:27 -0600
ETS
Thu, 19 Feb 1998 12:25:55 -0800
New Thread coper oxide growth
Brett Goldstein
Tue, 3 Feb 1998 10:26:57 +0000
<>
Wed, 4 Feb 1998 04:37:52 EST
New Thread copper
<>
Mon, 16 Feb 1998 19:28:22 -0800
Leslie O. Connally
Tue, 17 Feb 1998 08:15:05 -0800
New Thread copy requests
Lustig, Steven K..
Tue, 17 Feb 1998 18:33:13 -0500
Jerome Sallo
Tue, 17 Feb 1998 19:52:44 EST
New Thread Correction to FSL fax no
Jeremy Drake
Mon, 23 Feb 1998 16:31:04 +0000
<>
Tue, 24 Feb 1998 12:10:37 EST
New Thread Corrosion after electroless tin finish
Karl Ring
Fri, 27 Feb 1998 09:27:46 -0500
Gabriela Bogdan
Sat, 28 Feb 1998 04:03:20 +0000
New Thread corrosivity HASL v GOLD
Evan Jones
Fri, 27 Feb 1998 01:18:37 -0500
Kathy Palumbo
Fri, 27 Feb 1998 08:30:28 -0800
New Thread coupons
Gary Ferrari
Sat, 31 Jan 1998 18:47:06 -0600
Ed Cosper
Mon, 2 Feb 1998 10:01:28 -0600
New Thread CPCA 1998
JB
Fri, 6 Feb 1998 11:00:37 +0800
New Thread CTI Voltage
Mike Bailey
Wed, 18 Feb 1998 09:57:30 -0500
New Thread Cure acceleration with CO2, Humidity and Heat
ETS
Wed, 11 Feb 1998 14:24:53 -0800
New Thread Curing with CO2, humidity and heat.
ETS
Wed, 11 Feb 1998 09:44:16 -0800
New Thread Dark brown residue
Doug Pauls
Thu, 5 Feb 1998 08:34:53 EST
New Thread Depression mark during soldermask exposing
Padmanabha Anandapuram Halappa
Sat, 21 Feb 1998 13:19:18 EST
Afri Singh
Sat, 21 Feb 1998 14:57:14 -0500
John Haman Jr.
Mon, 23 Feb 1998 08:38:25 PST
Wayne Gitlitz
Mon, 23 Feb 1998 08:24:39 -0800
New Thread DES: Hole sizes for non-auto-insertable parts
Steve Collins
Mon, 23 Feb 1998 12:21:43 -0700
Hamilton, Richard -4454
Mon, 23 Feb 1998 12:41:38 -0700
Mark Ross
Mon, 23 Feb 1998 21:31:45 -0500
New Thread DES: Impedance software
Mitch Morey
Wed, 4 Feb 1998 14:35:45 -0800
New Thread Design over 1GHz
Mirka Halas
Wed, 25 Feb 1998 12:36:05 -0500
Joseph E. J. Duclos Jr.
Wed, 25 Feb 1998 19:00:53 -0500
John Laur
Wed, 25 Feb 1998 12:29:24 -0600
New Thread Design: Use of Silver Filled Epoxy as Reference Plane
APeder01
Fri, 6 Feb 1998 14:07:14 -0500
New Thread Dessicant Chamber
Sherry Warner
Wed, 4 Feb 1998 10:10:07 -0500
Poh Kong Hui
Wed, 4 Feb 1998 23:31:51 +0800
Charles Barker
Wed, 4 Feb 1998 09:34:12 -0600
Henry Earley
Wed, 4 Feb 1998 09:30:16 -0800
Ed Holton
Wed, 4 Feb 1998 09:59:23 -0500
Steves
Wed, 4 Feb 1998 11:08:55 +0000
New Thread Dielectric constants
Gary Griffin
Tue, 17 Feb 1998 12:49:17 -0800
Wollam-Wright, Lynda
Tue, 17 Feb 1998 13:17:11 -0800
Tue, 17 Feb 1998 22:21:24 -0800
Doug Jeffery
Wed, 18 Feb 1998 05:31:17 -0600
Colin
Wed, 18 Feb 1998 13:15:09 -0600
Gary Griffin
Fri, 20 Feb 1998 11:18:22 -0800
Manfred Huschka
Fri, 20 Feb 1998 14:15:45 -0600
Dennis Beerman
Fri, 20 Feb 1998 15:27:07 -0500
Lyle Wallig
Fri, 20 Feb 1998 15:44:42 EST
Doug McKean
Fri, 20 Feb 1998 16:29:17 -0500
New Thread Dow 3-1765 cure
Benjamin A Guthrie
Tue, 17 Feb 1998 10:07:47 -0500
Benjamin A Guthrie
Tue, 17 Feb 1998 13:11:40 -0500
New Thread Drilling of Holes
Lisa Williams
Wed, 4 Feb 1998 11:07:01 -0600
drilbert
Wed, 4 Feb 1998 19:08:39 -0800
New Thread Drum level alarms
Peter Blokhuis
Mon, 9 Feb 1998 12:21:27 EST
John Nelson
Mon, 9 Feb 1998 13:25:20 -0500
Joe Felts Jr.
Mon, 9 Feb 1998 11:27:52 -0700
Paul Klasek
Tue, 10 Feb 1998 08:27:21 +1100
Valquirio N. Carvalho
Mon, 9 Feb 1998 20:36:40 -0500
Thomas E. Waznis
Mon, 9 Feb 1998 19:56:44 -0800
New Thread Dual Lane Processing
ETS
Fri, 13 Feb 1998 14:22:07 -0800
<>
Sat, 14 Feb 1998 12:44:49 EST
New Thread Electrical Isolation Properties of Multilayer PCB's
Jeff Fries
Thu, 19 Feb 1998 19:49:15 -0600
Phillip J. Dudley
Thu, 19 Feb 1998 15:24:22 -0800
Hütter Simon
Fri, 20 Feb 1998 08:09:10 -0000
Gary Griffin
Fri, 20 Feb 1998 08:16:33 -0800
Doug Jeffery
Sat, 21 Feb 1998 05:08:00 -0600
New Thread Electrical Test Definitions for IPC-ET-652
Hill, Mike E.
Wed, 25 Feb 1998 17:52:46 -0500
New Thread Electrical Test Workshop
Dennis Maggi
Mon, 2 Feb 1998 01:47:10 EST
New Thread electrodep Cu foil vs. RA foil
Josh Moody
Mon, 9 Feb 1998 17:00:49 -0600
Formiller, Paul
Mon, 9 Feb 1998 17:22:53 -0800
<>
Tue, 10 Feb 1998 06:39:51 EST
Werner Engelmaier
Tue, 10 Feb 1998 08:17:17 EST
Shaddock, David M (CRD)
Wed, 11 Feb 1998 13:11:12 -0500
Meigs, Jonathan
Wed, 11 Feb 1998 15:38:00 -0700
New Thread electroless Ni/Au soft/hard
Afri Singh
Thu, 19 Feb 1998 20:47:07 -0500
Hütter Simon
Fri, 20 Feb 1998 07:42:56 -0000
New Thread Entek Plus coating thickness
Matthew Park
Tue, 10 Feb 1998 14:55:59 -0800
Greg Bartlett
Wed, 11 Feb 1998 08:32:29 +0000
Michael Carano
Wed, 11 Feb 1998 23:12:51 -0800
New Thread Equinox International.
<>
Fri, 20 Feb 1998 13:18:44 EST
New Thread Expereinced PCB Sales Reps
Raviv
Wed, 25 Feb 1998 13:25:56 -0500
New Thread FAB - Gold consumption rates
Ed Cosper
Wed, 4 Feb 1998 10:35:51 -0600
Lenny Kurup
Wed, 4 Feb 1998 12:08:44 -0500
Mike Barmuta
Wed, 4 Feb 1998 10:56:39 -0800
New Thread FAB, Test Coupons
James Patten
Tue, 10 Feb 1998 07:24:46 -0700
Richard MacCutcheon
Tue, 10 Feb 1998 09:22:00 -0700
New Thread FAB: Barrel Cracking MC-3D material
Steve Collins
Fri, 27 Feb 1998 07:17:40 -0700
Robisan1
Fri, 27 Feb 1998 10:11:05 EST
New Thread FAB: cross section docs
Mark Simmons
Tue, 10 Feb 1998 12:29:04 -0800
New Thread Fab: Drill Bits
sam mccorkel
Mon, 23 Feb 1998 13:15:08 -0500
drilbert
Tue, 24 Feb 1998 04:14:09 -0800
Richard Linn
Tue, 24 Feb 1998 22:50:48 +0800
New Thread FAB: Process controls for drilling
sam mccorkel
Fri, 6 Feb 1998 09:46:52 -0500
Ed Cosper
Fri, 6 Feb 1998 11:13:38 -0600
New Thread FAB: Pure Gold Process
Jacques A Coderre
Tue, 3 Feb 1998 08:55:08 -0500
New Thread FAB; Subject: Very Fine Line
ALDERETE, MICHAEL S
Thu, 5 Feb 1998 11:34:58 -0800
New Thread FBGA design
Achim Neu
Sun, 1 Feb 1998 12:08:23 +0100
New Thread Fillet Height
<>
Sun, 8 Feb 1998 07:34:34 EST
New Thread Fine Line Search
Jana Carraway
Tue, 17 Feb 1998 16:15:15 PST
New Thread fine pitch testing
Koblinger, Jürgen
Thu, 26 Feb 1998 18:12:31 +0100
New Thread Flipchip placement equip
Larry Crane
Mon, 16 Feb 1998 12:56:21 -0400
New Thread Flipchip placement equip -Reply
David Anderson
Thu, 19 Feb 1998 10:07:08 -0600
New Thread Florida Cirtech
<>
Thu, 19 Feb 1998 15:17:25 -0600
<>
Thu, 19 Feb 1998 17:45:58 EST
New Thread FMEA means what?
Ed Cosper
Fri, 20 Feb 1998 14:15:33 -0600
ADAMS, Mike
Fri, 20 Feb 1998 15:30:38 -0500
David Girard
Fri, 20 Feb 1998 15:39:01 -0500
Brad Vanderhoof
Fri, 20 Feb 1998 12:39:06 PST
New Thread FS: electrovert 500C
Sales Dept
Mon, 2 Feb 1998 12:34:14 -0500
New Thread GEB Laminate
Bernard Kessler & Associates LTD
Wed, 11 Feb 1998 10:36:26 -0500
New Thread Gen: Axarel supplier
Jim Marsico 516-595-5879
Tue, 24 Feb 1998 15:51:00 -0400
Doug Pauls
Tue, 24 Feb 1998 16:31:38 EST
Bev Christian
Wed, 25 Feb 1998 07:55:04 -0500
Sherry Warner
Wed, 25 Feb 1998 08:26:35 -0500
New Thread GEN: Greater Boston DC chapter meeting 2/18
Jeff Seeger
Fri, 13 Feb 1998 12:16:10 -0500
New Thread GEN: on the passing of a friend
Jeff Seeger
Thu, 12 Feb 1998 16:46:29 -0500
New Thread GEN: Short course in UK on Electronic Manufacturing
David Whalley
Fri, 20 Feb 1998 16:52:56 +0000
New Thread Gerber Software
Eddie Brunker
Fri, 13 Feb 1998 12:21:00 GMT
<>
Fri, 13 Feb 1998 07:34:04 EST
New Thread GLASS ARTWORK
Modular Components National, Inc.
Fri, 27 Feb 1998 13:17:09 -0500
Bob Seyfert
Fri, 27 Feb 1998 17:19:36 -0500
New Thread Glue dispenser machine v/s stencil printing
Ken Patel
Mon, 23 Feb 1998 19:03:28 -0800
ss yeo
Fri, 20 Mar 1998 19:43:40 +0800
Peggi J. Blakley
Tue, 24 Feb 1998 05:54:16 -0800
Charles Barker
Tue, 24 Feb 1998 08:37:47 -0600
Karen Tellefsen
Tue, 24 Feb 1998 09:44:45 -0500
<>
Tue, 24 Feb 1998 09:30:25 EST
New Thread Glue on solder mask
Paul Stolar
Tue, 24 Feb 1998 17:05:25 -0600
New Thread Gold for edge-board connectors thickness
Carlos R. Robert
Fri, 6 Feb 1998 19:30:01 AST
Phillip E. Hinton
Fri, 6 Feb 1998 21:42:55 EST
Stephen R. Gregory
Fri, 6 Feb 1998 23:25:41 EST
<>
Sat, 7 Feb 1998 09:03:26 EST
David D Hillman
Sun, 8 Feb 1998 14:43:25 -0600
John Haman Jr.
Mon, 9 Feb 1998 08:22:19 PST
Jerry Cupples
Mon, 9 Feb 1998 17:29:36 -0600
John Haman Jr.
Tue, 10 Feb 1998 08:24:28 PST
Rod Martens
Tue, 10 Feb 1998 08:43:48 -0700
Rhoads, Randall E
Mon, 16 Feb 1998 08:11:53 -0500
New Thread gold over entire board
Matthew Park
Thu, 19 Feb 1998 10:51:19 -0800
Gary Griffin
Thu, 19 Feb 1998 11:07:04 -0800
Hamilton, Richard -4454
Thu, 19 Feb 1998 12:27:07 -0700
Stephen R. Gregory
Thu, 19 Feb 1998 16:37:07 EST
Jack Crawford
Thu, 19 Feb 1998 19:07:57 -0600
Darrel Therriault
Fri, 20 Feb 1998 07:53:09 -0800
Eddie Brunker
Fri, 20 Feb 1998 17:10:06 GMT
Boggs, David
Fri, 20 Feb 1998 12:19:45 -0800
Stephen R. Gregory
Fri, 20 Feb 1998 16:24:42 EST
Kathy Palumbo
Mon, 23 Feb 1998 09:15:32 -0800
Stephen R. Gregory
Mon, 23 Feb 1998 13:50:18 EST
<>
Mon, 23 Feb 1998 16:42:15 -0600
New Thread Gold plating b/4 or after hal
John Haman Jr.
Tue, 3 Feb 1998 11:19:06 PST
New Thread Gold plating switch contacts
George Elliott
Mon, 2 Feb 1998 14:39:10 -0000
<>
Mon, 2 Feb 1998 11:03:26 EST
Joseph Fjelstad
Mon, 2 Feb 1998 08:18:12 -0800
Stephen R. Gregory
Tue, 3 Feb 1998 10:56:05 EST
New Thread Gold surface finish
<>
Wed, 25 Feb 1998 14:12:27 EST
Kathy Palumbo
Wed, 25 Feb 1998 11:17:47 -0800
David D Hillman
Thu, 26 Feb 1998 18:17:28 -0600
New Thread HASL solder specs
David D Hillman
Sun, 1 Feb 1998 18:38:16 -0600
New Thread Help on drying boards
Gabriela Bogdan
Mon, 2 Feb 1998 09:05:54 +0000
David D Hillman
Mon, 2 Feb 1998 07:00:54 -0600
Thomas E. Waznis
Mon, 2 Feb 1998 05:40:23 -0800
New Thread Hi James,
Mitch Morey
Tue, 10 Feb 1998 08:49:19 -0800
New Thread High-Frequency Dielectric Constant
Rhoads, Randall E
Wed, 4 Feb 1998 11:21:21 -0500
McGlaughlin, Jeffrey A
Wed, 4 Feb 1998 12:57:57 -0500
Manfred Huschka
Fri, 6 Feb 1998 01:07:19 -0600
Mikhail Khusid
Fri, 6 Feb 1998 06:54:46 -0500
New Thread How to treat a PWB ???
Wiessner, Christian
Fri, 13 Feb 1998 06:08:49 -0600
David D Hillman
Fri, 13 Feb 1998 07:55:58 -0600
New Thread I need .059 1/1 or 1/0 GE CEM3 or AL910 laminate
Lisa Parker
Fri, 6 Feb 1998 14:36:29 -0600
Ed Cosper
Fri, 6 Feb 1998 16:30:08 -0600
New Thread I'm looking to find a tranning course for PCB design & layout
Jimmy Blier
Wed, 11 Feb 1998 11:40:15 -0500
Jimmy Blier
Thu, 12 Feb 1998 08:30:00 -0500
John Riley
Fri, 13 Feb 1998 11:42:53 -0600
New Thread IC Adapters
Mike Wilson
Thu, 19 Feb 1998 08:26:31 -0800
Steve Hawn
Thu, 19 Feb 1998 08:46:03 -0800
New Thread Immersion Tin
John Haman Jr.
Tue, 3 Feb 1998 11:17:21 PST
Mark Simmons
Tue, 3 Feb 1998 10:00:08 -0800
<>
Tue, 3 Feb 1998 23:04:00 EST
New Thread Impedance Software
<>
Wed, 4 Feb 1998 12:52:02 CST
New Thread Information on learning curves.
Tony Bugeja
Fri, 13 Feb 1998 14:17:43 -0500
New Thread Information on Silver Terminals
Tony Bugeja
Tue, 10 Feb 1998 07:29:30 -0500
Don Fumia
Tue, 10 Feb 1998 08:44:56 -0500
Jerry Cupples
Tue, 10 Feb 1998 09:09:56 -0600
Phillip J. Dudley
Tue, 10 Feb 1998 08:05:28 -0800
New Thread IPC Designers Council Meeting (Atlanta Chapter)
<>
Mon, 16 Feb 1998 08:29:07 EST
New Thread IPC-610
<>
Thu, 12 Feb 1998 17:22:30 +0000
Muller, Mary
Thu, 12 Feb 1998 14:01:53 -0800
New Thread IPC-CF-150E
CCC Malaysia (E-mail)
Wed, 11 Feb 1998 15:29:01 +0800
New Thread IPCchat session announcement
<>
Thu, 12 Feb 1998 20:34:32 -0800
<>
Thu, 12 Feb 1998 20:34:32 -0800
<>
Tue, 24 Feb 1998 19:33:03 -0800
<>
Fri, 27 Feb 1998 15:27:55 -0800
New Thread J-STD-001B Cleaning Call out
Wesley Samples
Tue, 17 Feb 1998 15:41:27 -0600
New Thread jdec trays
Vertefeuille, Russ (AZ77)
Wed, 18 Feb 1998 11:06:19 -0600
Shea, Daniel
Wed, 18 Feb 1998 15:28:35 -0500
Shaddock, David M (CRD)
Fri, 27 Feb 1998 18:43:42 -0500
New Thread Kapton Etching
Bob
Fri, 13 Feb 1998 12:01:16 -0800
Paul Terranova
Fri, 13 Feb 1998 15:27:25 -0500
Sheila Smith
Fri, 13 Feb 1998 16:11:04 -0500
David Anderson
Fri, 13 Feb 1998 15:47:13 -0600
New Thread Kevlar reinforced laminate or prepreg
Sheila Smith
Wed, 25 Feb 1998 15:06:13 -0500
Leslie O. Connally
Wed, 25 Feb 1998 15:37:04 -0800
<>
Wed, 25 Feb 1998 17:05:16 EST
Jerome Sallo
Thu, 26 Feb 1998 11:37:08 EST
New Thread Laminate Identification
Dan LeVasseur
Tue, 10 Feb 1998 23:34:42 -0500
New Thread Laminate surface abrasion
D'Angelo, Ken
Thu, 26 Feb 1998 09:58:25 -0500
Paul Terranova
Thu, 26 Feb 1998 10:42:31 -0500
New Thread Lamination Presses Input
Richard MacCutcheon
Mon, 9 Feb 1998 11:24:00 -0700
Orna and Yehuda
Thu, 12 Feb 1998 00:35:25 +0200
New Thread Laser via in pad
David Backen
Sun, 1 Feb 1998 10:14:02 -0500
Thomas Jacob
Mon, 2 Feb 1998 18:11:01 +0100
New Thread Leaching of Gold into a solder pot?
Tony Bugeja
Tue, 10 Feb 1998 07:32:08 -0500
Jerry Cupples
Tue, 10 Feb 1998 09:27:31 -0600
Stephane Richard
Tue, 10 Feb 1998 13:39:02 -0500
Tue, 10 Feb 1998 21:08:41 -0800
Paul Klasek
Wed, 11 Feb 1998 08:45:23 +1100
New Thread Leaching of Gold into a solder pot? -Reply
Jon Moore
Thu, 12 Feb 1998 15:11:55 -0500
New Thread LEAD SPOT TEST
Bev Christian
Wed, 11 Feb 1998 14:43:01 -0500
David D Hillman
Thu, 12 Feb 1998 05:53:54 -0600
New Thread Looking for Equipment
John Haman Jr.
Fri, 20 Feb 1998 08:50:50 PST
Phil Dam
Tue, 24 Feb 1998 10:25:15 EST
New Thread looking for soldermask manufacturer
Tenison Stone
Mon, 9 Feb 1998 07:18:46 -0600
Larry J. Fisher
Wed, 11 Feb 1998 00:03:49 EST
New Thread Manufacturers Rep's Wanted
ETS
Mon, 2 Feb 1998 10:57:46 -0800
Douglas H Bennett- Sales Engineer
Mon, 2 Feb 1998 17:47:51 -0800
Jack Crawford
Mon, 2 Feb 1998 17:25:01 -0600
New Thread Mating Tin / Gold; SIMMs and sockets
Lee McCuistion
Tue, 24 Feb 1998 10:01:02 +0000
Karen Tellefsen
Tue, 24 Feb 1998 16:00:49 -0500
Rod Martens
Tue, 24 Feb 1998 14:38:24 -0700
Stephen Ayotte
Wed, 25 Feb 1998 13:52:08 -0500
New Thread metal sludge reduction
rameshl
Sat, 21 Feb 1998 14:23:50 +0500
rameshl
Mon, 23 Feb 1998 10:15:32 +0500
<>
Mon, 23 Feb 1998 09:39:24 EST
Graham Naisbitt
Mon, 23 Feb 1998 23:48:43 -0000
rameshl
Tue, 24 Feb 1998 09:04:25 +0500
rameshl
Tue, 24 Feb 1998 09:04:36 +0500
Ramesh
Tue, 24 Feb 1998 09:28:57 +0000
New Thread MICROSCOPE REPAIRS
David Girard
Thu, 12 Feb 1998 09:00:07 -0500
John Haman Jr.
Fri, 13 Feb 1998 08:11:25 PST
New Thread MICROSCOPE REPAIRS -Reply
Ron Hayashi
Thu, 12 Feb 1998 08:27:52 -0800
New Thread Microsection of Microvias
Reed, Randy
Thu, 26 Feb 1998 17:18:42 -0800
New Thread Microsections
BOB HAYNES
Tue, 24 Feb 1998 14:15:00 -0600
Paul Terranova
Tue, 24 Feb 1998 16:37:33 -0500
Gabriela Bogdan
Wed, 25 Feb 1998 11:38:09 +0000
New Thread MicroVia info, San Diego IPC Chapter
Mitch Morey
Wed, 18 Feb 1998 09:47:24 -0800
New Thread Min. Annular Ring
Michael Forrester
Wed, 18 Feb 1998 09:11:31 -0400
Gary Griffin
Wed, 18 Feb 1998 08:30:57 -0800
John Haman Jr.
Wed, 18 Feb 1998 13:24:03 PST
Lyle Wallig
Wed, 18 Feb 1998 17:02:05 EST
New Thread Modeling a IR reflow oven
W.Lawson
Wed, 4 Feb 1998 11:00:08 -0800
David Whalley
Fri, 6 Feb 1998 09:55:51 +0000
Werner Engelmaier
Sun, 8 Feb 1998 23:45:01 EST
New Thread Moisture Cure for Conformal Coatings
ETS
Tue, 10 Feb 1998 16:26:37 -0800
Tony Bugeja
Wed, 11 Feb 1998 07:48:28 -0500
<>
Wed, 11 Feb 1998 07:27:51 -0700
New Thread Moisture Cure for Conformal Coatings -Svar
Lars Ladefoged Holm
Wed, 11 Feb 1998 07:21:20 +0000
New Thread Moisture Sensitive Parts
Kane, Joseph
Mon, 2 Feb 1998 09:51:16 -0500
Graham Naisbitt
Mon, 2 Feb 1998 22:38:44 -0000
Stephen R. Gregory
Tue, 3 Feb 1998 11:07:35 EST
New Thread Moisture Sensitivity
Signorelli, Paul
Wed, 11 Feb 1998 10:13:08 -0600
New Thread Most weird problem: Solder between epoxy & fab or epoxy &
Stephen R. Gregory
Thu, 5 Feb 1998 23:16:43 EST
New Thread Most weird problem: Solder between epoxy & fab or epoxy & comp
Ken Patel
Thu, 5 Feb 1998 18:02:04 -0800
COLLINS, GRAHAM
Fri, 6 Feb 1998 07:53:07 -0500
Ed Holton
Fri, 6 Feb 1998 08:00:12 -0500
Darryl Small
Fri, 6 Feb 1998 16:36:57 -0400
John Maxwell
Mon, 9 Feb 1998 08:50:18 -0700
New Thread MTBF
Werner Engelmaier
Tue, 3 Feb 1998 08:23:34 EST
New Thread National PWB Resource Center
Holly Lynch
Wed, 11 Feb 1998 08:59:20 -0500
New Thread Need inexpensive method of glueing parts on PCB
Chris Stack
Tue, 24 Feb 1998 11:06:01 -0500
Charles Barker
Wed, 25 Feb 1998 07:45:11 -0600
New Thread Nickel,Gold&solder masks
Gabriela Bogdan
Sat, 21 Feb 1998 11:54:45 +0000
Afri Singh
Sat, 21 Feb 1998 14:51:31 -0500
Lenny Kurup
Sun, 22 Feb 1998 22:44:27 -0500
<>
Tue, 24 Feb 1998 10:19:49 EST
New Thread NON-THERMALLY RELIEVED VIAS- ring voids
Richard G Smith
Tue, 24 Feb 1998 17:13:29 -0600
raymond lockshier
Tue, 24 Feb 1998 18:27:38 -0500
Mike Bailey
Tue, 24 Feb 1998 15:41:12 -0500
<>
Wed, 25 Feb 1998 08:46:03 EST
New Thread NON-THERMALLY RELIEVED VIAS- ring voids -Reply
Fred Johnson
Tue, 24 Feb 1998 22:52:00 +0000
John Haman Jr.
Wed, 25 Feb 1998 08:33:32 PST
Matthew Park
Wed, 25 Feb 1998 08:05:24 -0800
raymond lockshier
Wed, 25 Feb 1998 12:50:33 -0500
New Thread NON-THERMALLY RELIEVED VIAS- ring voids -Reply -Reply
Larry Campbell
Wed, 25 Feb 1998 11:34:11 -0500
New Thread Omikron Immersion White Tin
Tenison Stone
Wed, 18 Feb 1998 15:05:04 -0600
<>
Wed, 18 Feb 1998 22:13:38 EST
New Thread ORGANIC COATING(PRE-FLUX) THICKNESS MEASUREMEN
<>
Sat, 14 Feb 1998 09:36:11 +0900
H H TONG
Sat, 14 Feb 1998 18:43:10 +0800
Eltek Ltd. - Process Engineering
Sun, 15 Feb 1998 18:07:52 +0200
New Thread OSP coating and soldermask
Ed Holton
Wed, 25 Feb 1998 09:21:20 -0400
New Thread OSP Stain
tgyee
Wed, 25 Feb 1998 13:46:29 PST
Tal Young-Kim
Fri, 27 Feb 1998 18:46:25 +0900
Eltek Ltd. - Process Engineering
Thu, 26 Feb 1998 17:39:36 +0200
New Thread Paco Via Material
Ron Hayashi
Mon, 9 Feb 1998 09:39:15 -0800
New Thread pad lifting / pad rotation
Erat, Wolfgang
Fri, 27 Feb 1998 14:36:12 -0500
Leslie O. Connally
Fri, 27 Feb 1998 14:18:46 -0800
New Thread pad lifting / pad rotation -Reply
Fred Johnson
Fri, 27 Feb 1998 21:09:39 +0000
Fred Johnson
Fri, 27 Feb 1998 21:17:28 +0000
New Thread panel yield on back plane
Ken Patel
Tue, 3 Feb 1998 18:29:23 -0800
Joseph E. J. Duclos Jr.
Wed, 4 Feb 1998 07:18:12 -0500
New Thread Panelization
<>
Wed, 11 Feb 1998 18:27:00 EST
John Parsons
Wed, 11 Feb 1998 15:41:01 +0000
Stephen R. Gregory
Wed, 11 Feb 1998 18:56:25 EST
Smith,Robert
Thu, 12 Feb 1998 06:47:00 -0500
New Thread PBGA rework with paste?
Brad Kendall
Wed, 11 Feb 1998 08:31:08 -0500
New Thread PCB ASSEMBLER
Eddy Chen
Sat, 28 Feb 1998 12:31:35 +0800
New Thread PCB cut-out
annie laberge
Fri, 20 Feb 1998 15:04:16 -0500
Hamilton, Richard -4454
Fri, 20 Feb 1998 14:13:40 -0700
Steve Collins
Fri, 20 Feb 1998 15:26:23 -0700
Doug Jeffery
Sat, 21 Feb 1998 05:12:42 -0600
John Haman Jr.
Mon, 23 Feb 1998 08:32:36 PST
New Thread PCB desoldering
M. Betournay
Tue, 10 Feb 1998 10:18:24 -0500
Charles Barker
Tue, 10 Feb 1998 09:20:03 -0600
Stephane Richard
Tue, 10 Feb 1998 13:27:23 -0500
New Thread PCB Laminate FAQ - need support!
JB
Fri, 6 Feb 1998 11:00:32 +0800
John Haman Jr.
Fri, 6 Feb 1998 08:33:02 PST
Jerome Sallo
Fri, 6 Feb 1998 12:10:44 EST
New Thread PCB Milling machines
Elstgeest Sander
Tue, 10 Feb 1998 11:11:13 +0000
Gary Crowell Sr.
Tue, 10 Feb 1998 11:10:27 -0700
New Thread PCB Prototype Facility setup
Alan Berni
Fri, 6 Feb 1998 14:03:41 -0500
Jana Carraway
Fri, 6 Feb 1998 14:14:54 PST
<>
Fri, 6 Feb 1998 17:36:27 EST
New Thread PCB Prototype Machine
Alan Berni
Tue, 3 Feb 1998 16:44:09 -0500
Mike Ralph
Tue, 3 Feb 1998 17:33:05 -0500
New Thread PCB Supplier
Mike Masters
Fri, 20 Feb 1998 15:42:42 -0500
Afri Singh
Sat, 21 Feb 1998 14:26:24 -0500
New Thread PCB warpage
Jim Mathis
Mon, 16 Feb 1998 15:52:39 EST
ETS
Mon, 16 Feb 1998 13:48:53 -0800
McGlaughlin, Jeffrey A
Mon, 16 Feb 1998 16:51:25 -0500
Shea, Daniel
Mon, 16 Feb 1998 16:56:19 -0500
ETS
Mon, 16 Feb 1998 14:43:08 -0800
<>
Mon, 16 Feb 1998 15:48:49 -0600
Hamilton, Richard -4454
Mon, 16 Feb 1998 16:01:27 -0700
ETS
Mon, 16 Feb 1998 15:27:18 -0800
"ì´ì§„호"
Tue, 17 Feb 1998 14:05:33 +0900
Chi-man Chan
Tue, 17 Feb 1998 21:13:31 +1100
Dennis Beerman
Tue, 17 Feb 1998 07:37:26 -0500
Fred Pescitelli
Tue, 17 Feb 1998 08:41:39 -0500
Ruben Irizarry
Tue, 17 Feb 1998 10:04:04 -0700
Dan Ratcliff 813-530-8762
Tue, 17 Feb 1998 09:55:55 -0500
Mark Gillan
Tue, 17 Feb 1998 16:24:00 +0000
Nicholas Kane
Wed, 18 Feb 1998 05:12:59 +1100
Jorge Martinez
Tue, 17 Feb 1998 11:08:42 -0800
Jorge Martinez
Tue, 17 Feb 1998 11:13:18 -0800
Darrel Therriault
Tue, 17 Feb 1998 12:12:59 -0800
ETS
Tue, 17 Feb 1998 12:27:56 -0800
Steve Collins
Tue, 17 Feb 1998 15:54:35 -0700
Gary Griffin
Tue, 17 Feb 1998 14:53:11 -0800
Rose, Daniel B
Tue, 17 Feb 1998 15:59:58 -0700
David Anderson
Tue, 17 Feb 1998 17:28:52 -0600
enza hill
Tue, 17 Feb 1998 18:11:15 -0600
ETS
Tue, 17 Feb 1998 16:39:36 -0800
Eddy Chen
Wed, 18 Feb 1998 16:32:25 +0800
Jim Mathis
Wed, 18 Feb 1998 17:27:19 EST
Jim Mathis
Wed, 18 Feb 1998 17:49:36 EST
Hamilton, Richard -4454
Wed, 18 Feb 1998 16:00:07 -0700
Dennis Beerman
Thu, 19 Feb 1998 09:01:11 -0500
Hew How Chee
Sat, 21 Feb 1998 15:40:28 +0800
Rob van Pol - Senior Account Engineer
Sat, 21 Feb 1998 12:58:50 +0100
New Thread PCB warpage - Reply
Mitch Morey
Thu, 19 Feb 1998 09:17:27 -0800
Muller, Mary
Thu, 19 Feb 1998 11:00:04 -0800
Jack Crawford
Thu, 19 Feb 1998 18:52:00 -0600
New Thread PCB warpage -Reply
Sonia Tena
Tue, 17 Feb 1998 09:48:34 -0800
Matthew Park
Wed, 18 Feb 1998 15:52:54 -0800
Shea, Daniel
Thu, 19 Feb 1998 06:52:58 -0500
Lustig, Steven K..
Thu, 19 Feb 1998 08:28:10 -0500
Kelly Kovalovsky
Thu, 19 Feb 1998 09:04:18 -0500
Dwight Mattix
Thu, 19 Feb 1998 11:28:44 -0800
annie laberge
Fri, 20 Feb 1998 09:41:53 -0500
New Thread Placement system
Valladares, Hector A (FL51)
Fri, 13 Feb 1998 17:27:42 -0500
New Thread Plating Rectifier setup
Doug Jeffery
Thu, 19 Feb 1998 20:24:34 -0600
<>
Fri, 20 Feb 1998 10:44:09 -0800
New Thread Polyimide
Achim Neu
Sun, 8 Feb 1998 11:07:13 +0100
New Thread Polyimide and BT material
Lourdes Mertens
Tue, 17 Feb 1998 08:39:50 -0700
Orna and Yehuda
Fri, 20 Feb 1998 00:30:36 +0200
New Thread polyimide damage after peroxide etching
George Bokisa
Thu, 26 Feb 1998 09:56:42 -0800
New Thread Pre-stamped soldermask
Achim Neu
Sun, 8 Feb 1998 11:04:49 +0100
New Thread pre-wave masking
Jim Mathis
Mon, 16 Feb 1998 16:01:57 EST
Bev Christian
Mon, 16 Feb 1998 17:28:35 -0500
Peter Swanson
Tue, 17 Feb 1998 09:08:47 GMT
New Thread Precision Valve and Automation
ETS
Fri, 20 Feb 1998 10:52:51 -0800
New Thread Precision Valve and Automation -Reply
JON MOORE
Fri, 20 Feb 1998 15:02:32 -0500
New Thread Press wanted
<>
Tue, 3 Feb 1998 20:25:25 EST
New Thread Probing on fine picht SMD leads
Jan Bokhove
Thu, 19 Feb 1998 03:47:10 -0800
Gary Griffin
Thu, 19 Feb 1998 08:31:43 -0800
New Thread Probing on fine pitch SMD leads
Jan Bokhove
Fri, 20 Feb 1998 07:30:07 -0800
Jan Bokhove
Fri, 20 Feb 1998 07:30:07 -0800
New Thread Problem with new XZ17B Coates solder resist catalyst
Roger Unwin
Wed, 18 Feb 1998 10:21:33 +0000
New Thread Problems due to prepregs selection & it's fix
Ken Patel
Thu, 19 Feb 1998 15:45:55 -0800
Mitch Morey
Thu, 19 Feb 1998 16:15:53 -0800
New Thread Production Management in PCB shops
Roland Jaquet
Thu, 5 Feb 1998 08:38:53 +0100
New Thread Pull Strengths
Heeran-C17277 David
Mon, 23 Feb 1998 14:06:20 U
New Thread Purchase of used Microscopes
Tony Bugeja
Wed, 4 Feb 1998 12:11:59 -0500
John Haman Jr.
Wed, 4 Feb 1998 14:37:34 PST
<>
Thu, 5 Feb 1998 15:01:08 EST
New Thread PWB Cost
Hamilton, Richard -4454
Fri, 6 Feb 1998 14:18:24 -0700
New Thread PWB COSTING
BPL-PCB, Doddaballapur
Fri, 6 Feb 1998 21:13:23 +0500
New Thread PWB punching tool life
BPL-PCB, Doddaballapur
Thu, 26 Feb 1998 18:51:47 +0500
Steve Collins
Thu, 26 Feb 1998 07:49:23 -0700
New Thread Quality Labels ?
Ken Patel
Mon, 23 Feb 1998 15:08:40 -0800
Evan Jones
Mon, 23 Feb 1998 19:49:54 -0500
New Thread Question : "Crackling" noise in boards post SMT
Koushik ATD Banerjee
Thu, 26 Feb 1998 11:41:00 PST
Lustig, Steven K..
Thu, 26 Feb 1998 14:34:11 -0500
Nicholas Kane
Fri, 27 Feb 1998 06:39:40 +1100
Matthew Park
Thu, 26 Feb 1998 12:25:17 -0800
New Thread Questions Regarding Castellations on a MCM
Michael Forrester
Wed, 11 Feb 1998 10:01:28 -0400
New Thread Re : [TN] Circuit board repair kits
Weber Chuang
Mon, 9 Feb 1998 10:07:25 +0800
DAVID C WEBER
Mon, 9 Feb 1998 21:12:41 -0500
ETS
Tue, 10 Feb 1998 09:34:21 -0800
New Thread Re Air Ion Level Measurement
Moffitj
Sat, 28 Feb 1998 16:22:14 EST
New Thread Re J/STD/A-610
<>
Thu, 12 Feb 1998 16:14:16 EST
New Thread Release: DPO - IPO "How To" Tools
To: Press Contacts - From:
Wed, 18 Feb 1998 12:46:41 -0700
Stephen R. Gregory
Wed, 18 Feb 1998 16:39:36 EST
New Thread Reliability vs Inner Layer break Out
Poulin, Michel
Thu, 5 Feb 1998 14:44:50 -0500
New Thread Reply Error
ETS
Thu, 19 Feb 1998 12:33:30 -0800
New Thread RF Plasma tool
Ducas,Patrick
Thu, 19 Feb 1998 13:04:00 -0500
New Thread RF Plasma tool -Reply
Matthew Park
Thu, 19 Feb 1998 11:10:20 -0800
New Thread RMA vs. No Clean for BGA
MARK McAULEY
Tue, 10 Feb 1998 17:06:29 -0600
New Thread Roku-Roku Sangyo, Ltd.
William E. Johnson
Fri, 27 Feb 1998 15:58:52 -0800
New Thread Roughness plating
"류근정"
Tue, 24 Feb 1998 18:08:45 +0900
J. Warhelere
Tue, 24 Feb 1998 18:15:15 -0500
New Thread RP machine
majid aghababazadeh
Wed, 11 Feb 1998 15:04:24 -0800
New Thread San Diego Chapter of the IPC Designer Council
Joseph Zdybowicz
Wed, 18 Feb 1998 10:58:41 -0800
New Thread San Diego Chapter of the IPC Designers Council
Joseph Zdybowicz
Mon, 2 Feb 1998 09:46:06 -0800
roberto
Tue, 3 Feb 1998 18:00:34 +0200
New Thread SEARCH warpage
"ì´í•œì£¼"
Mon, 23 Feb 1998 18:04:29 +0900
New Thread single-sided solder requirements
JON MOORE
Mon, 23 Feb 1998 11:13:45 -0500
New Thread SIR Testing for BGAs and CSPs
Rose, Daniel B
Thu, 19 Feb 1998 11:09:39 -0700
Graham Naisbitt
Thu, 19 Feb 1998 23:26:55 -0000
tgyee
Fri, 20 Feb 1998 08:44:10 PST
New Thread SM Lead dimension specification
Kicha / Krishna
Tue, 24 Feb 1998 06:44:12 PST
Dennis Beerman
Tue, 24 Feb 1998 12:21:22 -0500
Jack Crawford
Tue, 24 Feb 1998 11:30:07 -0600
New Thread Small holes, Thick Boards & Hole Reliability
Sat, 31 Jan 1998 17:02:27 -0800
New Thread SMEMA Specifications
ETS
Wed, 25 Feb 1998 14:49:06 -0800
Hamilton, Richard -4454
Wed, 25 Feb 1998 15:55:49 -0700
New Thread SNEC meeting
Gary Ferrari
Fri, 6 Feb 1998 15:05:49 EST
New Thread solder balling
Krishna Kalyan
Fri, 6 Feb 1998 10:08:00 PST
Eddie Brunker
Mon, 9 Feb 1998 09:28:31 GMT
New Thread Solder balls spec
<>
Thu, 26 Feb 1998 15:50:47 EST
Muller, Mary
Thu, 26 Feb 1998 13:34:52 -0800
David Girard
Thu, 26 Feb 1998 16:49:21 -0500
Jack Crawford
Thu, 26 Feb 1998 16:05:13 -0600
New Thread Solder Joint wetting
Kasprzak, Bill (esd) US
Mon, 23 Feb 1998 08:04:00 PST
Stephen R. Gregory
Mon, 23 Feb 1998 11:04:53 EST
Jack Crawford
Mon, 23 Feb 1998 12:56:01 -0600
New Thread Solder Paste Inspection R & R Study
<>
Fri, 13 Feb 1998 15:08:19 -0500
New Thread Solder Paste Printing Process
Kathy Palumbo
Thu, 12 Feb 1998 15:21:31 -0800
Brad Kendall
Fri, 13 Feb 1998 10:55:59 -0500
New Thread Solder paste relaxation/characteristic time
tana
Tue, 3 Feb 1998 15:36:37 +0000
New Thread Solder paste relaxation/characteristic time -Reply
Matthew Park
Tue, 3 Feb 1998 12:55:56 -0800
Stephen R. Gregory
Tue, 3 Feb 1998 16:59:21 EST
New Thread Solder Requirements for Chip Scale BGA's
Kathy Palumbo
Thu, 12 Feb 1998 15:32:23 -0800
Chan, Marcelo
Fri, 13 Feb 1998 08:03:10 -0500
Stephen R. Gregory
Fri, 13 Feb 1998 18:03:21 EST
Michael Weiner
Sun, 15 Feb 1998 08:28:35 +0200
New Thread solder shear strength
COLLINS, GRAHAM
Tue, 3 Feb 1998 14:23:30 -0500
JoAnn Amerson
Tue, 3 Feb 1998 15:32:34 +0000
Paul Klasek
Wed, 4 Feb 1998 13:49:07 +1100
New Thread Solder-on-Gold Fingers
Shaddock, David M (CRD)
Tue, 3 Feb 1998 09:43:34 -0500
New Thread Solderability od alloy 42
Tom Monico
Wed, 18 Feb 1998 14:15:44 -0500
Paul Terranova
Wed, 18 Feb 1998 14:35:57 -0500
New Thread Solderability of alloy 42
Edwards, Ted A (AZ75)
Wed, 18 Feb 1998 16:45:41 -0600
New Thread Solderball connection
Achim Neu
Wed, 18 Feb 1998 07:36:59 +0100
New Thread soldermask
Tenison Stone
Fri, 6 Feb 1998 07:46:36 -0600
New Thread Soldermask developing
Padmanabha Anandapuram Halappa
Mon, 9 Feb 1998 08:14:20 EST
Lenny Kurup
Mon, 9 Feb 1998 00:29:04 -0500
Larry J. Fisher
Mon, 9 Feb 1998 00:50:30 EST
fgolisan
Mon, 9 Feb 1998 08:33:22 PST
Ted Stern
Mon, 9 Feb 1998 12:54:44 -0800
Afri Singh
Mon, 9 Feb 1998 18:06:49 -0500
New Thread Soldermask foil
Achim Neu
Mon, 9 Feb 1998 20:55:30 +0100
New Thread SolderMask Types
<>
Thu, 19 Feb 1998 08:54:28 -0700
John Haman Jr.
Thu, 19 Feb 1998 17:40:54 PST
George Toman
Thu, 19 Feb 1998 17:11:31 -0500
<>
Thu, 19 Feb 1998 14:40:21 -0700
New Thread SOURCE FOR SCREEN MESH CLOTH & EMULSION
BPL-PCB, Doddaballapur
Tue, 10 Feb 1998 17:07:16 +0500
John Nelson
Tue, 10 Feb 1998 10:11:24 -0500
ETS
Tue, 10 Feb 1998 09:34:28 -0800
Brad Vanderhoof
Tue, 10 Feb 1998 09:05:52 PST
New Thread Spare part for spray fluxer
Suchai
Sat, 7 Feb 1998 20:14:39 +0700
New Thread Specifications
<>
Mon, 23 Feb 1998 07:53:36 -0600
<>
Mon, 23 Feb 1998 13:09:05 EST
Lisa Williams
Mon, 23 Feb 1998 16:37:14 -0600
New Thread Specifications for cable assemblers
Rick Racinskas
Wed, 11 Feb 1998 13:13:14 -0800
New Thread Specs on Board Warpage
Phillip E. Hinton
Thu, 19 Feb 1998 21:17:40 EST
New Thread strange word
Wolfried A. A. Popelier
Mon, 9 Feb 1998 09:07:09 -0200
<>
Mon, 9 Feb 1998 13:44:07 +0100
Doug Pauls
Mon, 9 Feb 1998 07:53:55 EST
Larry J. Fisher
Wed, 11 Feb 1998 23:14:38 EST
Gary Ferrari
Thu, 12 Feb 1998 05:49:46 -0600
New Thread Subscribe
Martin Valfridsson
Thu, 5 Feb 1998 10:48:11 +0100
Al Hamilton
Thu, 5 Feb 1998 09:25:10 EST
Josh Moody
Mon, 9 Feb 1998 08:49:11 -0600
Jimmy
Sat, 14 Feb 1998 17:13:26 +0800
New Thread SUPPLIER EVALUATION AND QUALIFICATION
<>
Wed, 25 Feb 1998 08:37:21 -0600
New Thread Surface Finishes
<>
Wed, 11 Feb 1998 16:56:35 -0600
Keith Larson
Wed, 11 Feb 1998 20:09:34 -0600
<>
Thu, 12 Feb 1998 00:26:22 EST
John Coffman
Thu, 12 Feb 1998 06:30:55 -0500
Thu, 12 Feb 1998 19:49:32 -0800
<>
Thu, 12 Feb 1998 19:35:09 EST
New Thread survey report
Grace Electronic Materials Pte Ltd
Wed, 4 Feb 1998 12:29:32 +0800
Stephanie Kaplan
Wed, 25 Feb 1998 11:52:10 -0600
New Thread suspended particle specifications
Sohn, John E (John)
Fri, 27 Feb 1998 15:58:00 -0500
New Thread TechNet Digest - 2 Dec 1997 to 3 Dec 1997
E.A. Speer
Thu, 5 Feb 1998 07:11:36 -0500
New Thread TechNet Forum....Is it just me?
Hamilton, Richard -4454
Tue, 3 Feb 1998 09:35:26 -0700
ETS
Tue, 3 Feb 1998 12:44:48 -0800
Darrel Therriault
Tue, 3 Feb 1998 12:58:58 -0800
Rhoads, Randall E
Tue, 3 Feb 1998 15:53:16 -0500
Jack Crawford
Tue, 3 Feb 1998 17:49:12 -0600
Hans Rohr
Tue, 3 Feb 1998 21:07:54 -0500
Ecad technologies pvt ltd
Wed, 4 Feb 1998 08:32:08 +0530
<>
Tue, 3 Feb 1998 22:39:48 EST
New Thread Technet Subscription
Adrian Sabater
Mon, 16 Feb 1998 09:21:11 -0800
New Thread Tell me? Could Pcaster Make YOU $70,000 per Month on the NET?
<>
Sat, 21 Feb 1998 06:50:50 -0600
New Thread Temporary Soldermask
Brian L Guidi
Tue, 17 Feb 1998 08:59:04 -0500
Phil Bavaro
Sun, 22 Feb 1998 14:13:05 -0800
New Thread Temproary resist for immersion gold
C J Long
Tue, 17 Feb 1998 11:42:05 +0800
New Thread Temproary resist for immersion gold -Reply
Ken Bridges
Tue, 17 Feb 1998 19:33:01 -0800
New Thread test
<>
Fri, 13 Feb 1998 13:47:13 EST
New Thread TN : Explain me about "Nodules"
Jong-Gon, Kim
Mon, 2 Feb 1998 16:46:49 +0900
New Thread TN Automatic evaluation of microsections
Lars Ladefoged Holm
Thu, 26 Feb 1998 07:53:22 +0000
New Thread To On or Not to On
Hew How Chee
Sat, 14 Feb 1998 11:23:27 +0800
Paul Klasek
Mon, 16 Feb 1998 10:47:33 +1100
Jan Bokhove
Mon, 16 Feb 1998 07:28:15 -0800
Jan Bokhove
Mon, 16 Feb 1998 07:28:15 -0800
Ed Holton
Mon, 16 Feb 1998 14:01:50 -0500
New Thread To On or Not to On -Reply
Matthew Park
Mon, 16 Feb 1998 08:14:50 -0800
JoAnn Amerson
Mon, 16 Feb 1998 11:38:15 +0000
Ricardo H. Moreno
Mon, 16 Feb 1998 18:49:12 PST8
New Thread To On or Not to On -Reply -Reply
Matthew Park
Mon, 16 Feb 1998 10:53:51 -0800
JoAnn Amerson
Mon, 16 Feb 1998 14:23:29 +0000
Karen Tellefsen
Mon, 16 Feb 1998 14:37:37 -0500
ETS
Mon, 16 Feb 1998 12:50:35 -0800
JoAnn Amerson
Mon, 16 Feb 1998 16:01:02 +0000
Jeff Mallia
Tue, 17 Feb 1998 10:00:51 +1100
Karen Tellefsen
Mon, 16 Feb 1998 16:42:13 -0500
ETS
Mon, 16 Feb 1998 16:07:01 -0800
Mitch Morey
Tue, 17 Feb 1998 08:44:34 -0800
New Thread To On or Not to On : Feedback
Hew How Chee
Sat, 21 Feb 1998 13:44:02 +0800
New Thread To On or Not to On : Thank you all
Hew How Chee
Sat, 21 Feb 1998 11:26:54 +0800
New Thread Tonites meeting is CANCELLED
Janice Lund
Wed, 18 Feb 1998 12:09:31 -0500
<>
Wed, 18 Feb 1998 13:31:44 -0500
New Thread tracking assemblies
Lustig, Steven K..
Tue, 3 Feb 1998 16:35:24 -0500
New Thread Training course(s)...
Mitch Morey
Wed, 11 Feb 1998 09:19:31 -0800
New Thread Transformer Adhesive
Martin Dooner *
Tue, 17 Feb 1998 23:14:42 -0000
New Thread UL APPROVAL (BUILDUP PCB)
Jae-heun Joung
Thu, 19 Feb 1998 09:04:30 +0900
Poh Kong Hui
Fri, 20 Feb 1998 06:32:41 +0800
New Thread Un-subscribe
Wesley Samples
Wed, 25 Feb 1998 07:36:54 -0600
<>
Wed, 25 Feb 1998 16:19:15 +0000
John Coffman
Wed, 25 Feb 1998 11:43:03 -0500
New Thread unsubscribe
Bryan West
Tue, 17 Feb 1998 09:37:26 -0500
Valladares, Hector A (FL51)
Thu, 19 Feb 1998 17:43:41 -0500
New Thread Use of Compliant pin connectors on RF material backplane
Chan, Marcelo
Thu, 12 Feb 1998 08:49:56 -0500
New Thread Use of Heat, Humidity, CO2 to Accelerate Conformal Coating Process
Lester Bennington
Mon, 16 Feb 1998 09:06:16 -0400
New Thread Used Optek DPL?
Chuck Brummer
Wed, 4 Feb 1998 14:30:59 -0800
New Thread v-score depanelling tool
Matthew Park
Tue, 24 Feb 1998 08:21:01 -0800
Steve Collins
Tue, 24 Feb 1998 11:53:40 -0700
Jim Hepburn
Tue, 24 Feb 1998 15:28:55 -0500
Charles Barker
Wed, 25 Feb 1998 07:47:51 -0600
Stephen Ayotte
Wed, 25 Feb 1998 15:17:38 -0500
New Thread V-scored Panel Boards
<>
Wed, 18 Feb 1998 12:13:38 -0500
Stephen R. Gregory
Wed, 18 Feb 1998 13:40:20 EST
Mark Simmons
Wed, 18 Feb 1998 11:51:11 -0800
New Thread Very Fine Line
Jana Carraway
Wed, 4 Feb 1998 10:40:22 PST
Per Viklund
Wed, 4 Feb 1998 21:44:19 +0100
Mike Moreau
Wed, 4 Feb 1998 14:55:22 -0800
Thomas Jacob
Thu, 5 Feb 1998 10:10:50 +0100
craig sutton
Thu, 5 Feb 1998 22:47:10 -0800
New Thread Vias in SMT pads
Kishpaugh Geoff
Thu, 19 Feb 1998 19:24:55 -0600
enza hill
Thu, 19 Feb 1998 23:31:38 -0600
Gary Griffin
Fri, 20 Feb 1998 08:10:47 -0800
New Thread Vias in SMT pads -Reply
Matthew Park
Fri, 20 Feb 1998 12:04:57 -0800
Dennis Beerman
Fri, 20 Feb 1998 15:34:06 -0500
enza hill
Sat, 21 Feb 1998 10:14:07 -0600
New Thread Vias Surface Mount Lands
Richard W. Boerdner
Mon, 23 Feb 1998 09:49:51 -0500
New Thread Video Micrometer
SEM Lab, Inc.
Mon, 23 Feb 1998 16:31:04 -0600
New Thread virus alert - NO TECHNET COMMENTS ON THIS HOAX, PLEASE
Jack Crawford
Mon, 9 Feb 1998 17:45:22 -0600
New Thread virus alert -Forwarded
Kathy Palumbo
Mon, 9 Feb 1998 14:16:09 -0800
Stella - Holowatch
Tue, 10 Feb 1998 18:22:04 -0500
New Thread Virus Alerts
Bob Lundquist
Mon, 9 Feb 1998 16:39:00 PST
Douglas H Bennett- Sales Engineer
Tue, 10 Feb 1998 09:03:15 -0800
New Thread Voids in PTH joints
Chris Hunt
Tue, 10 Feb 1998 16:07:58 +0000
New Thread wavesoldering (To On or Not to On : Feedback -Reply)
Matthew Park
Mon, 23 Feb 1998 14:51:59 -0800
New Thread Wet Process Equipment in Asia
Thach Truong
Sun, 22 Feb 1998 07:24:58 -0600
<>
Sun, 22 Feb 1998 11:03:28 EST
<>
Mon, 23 Feb 1998 09:35:10 EST
New Thread What can I use to clean my boards after rework if I am
Evan Jones
Thu, 12 Feb 1998 23:49:21 -0500
New Thread What can I use to clean my boards after rework if I am in NO -CLEAN Tech.??????
Ruben Irizarry
Thu, 12 Feb 1998 10:40:14 -0700
Bev Christian
Thu, 12 Feb 1998 11:43:20 -0500
New Thread What can I use to clean my boards after rework if I am in NO-CLEAN Tech.??????
Jack Crawford
Thu, 12 Feb 1998 10:12:56 -0600
David D Hillman
Thu, 12 Feb 1998 16:30:27 -0600
New Thread What is the advantage of brass coated Cu foil?
JB
Thu, 19 Feb 1998 12:16:58 +0800
New Thread What is the home address of TechNet
<>
Thu, 5 Feb 1998 11:09:43 +0000
Charles Barker
Thu, 5 Feb 1998 07:27:41 -0600
Jack Crawford
Thu, 5 Feb 1998 10:31:30 -0600
New Thread Whiskers with Sn99.3
Phillip E. Hinton
Tue, 3 Feb 1998 22:22:13 EST
David D Hillman
Wed, 4 Feb 1998 11:23:37 -0600
Rob Schetty
Wed, 4 Feb 1998 16:51:38 -0500
New Thread Whiskers with Sn99.3/unfused PbSn PWB plating
Chan, Marcelo
Wed, 4 Feb 1998 12:46:12 -0500
New Thread Why DI - lowest cost DI quality
Bob Mesick
Sun, 15 Feb 1998 09:29:58 +0000
New Thread Why DI?
J. Warhelere
Sat, 14 Feb 1998 17:12:34 -0500
Eltek Ltd. - Process Engineering
Sun, 15 Feb 1998 18:07:46 +0200
Ed Cosper
Mon, 16 Feb 1998 08:58:57 -0600
New Thread Why DI? -Reply
JON MOORE
Mon, 16 Feb 1998 12:21:59 -0500
New Thread WIREBONDING WIRE AGE
Jim Burns (w/o bogus)
Wed, 18 Feb 1998 11:57:13 -0500
New Thread Work factor
Francisco Brice $B!" (Jo / Molex de M $B#Y (Jico
Thu, 12 Feb 1998 16:08:08 -0600
Kasprzak, Bill (esd) US
Fri, 13 Feb 1998 08:24:00 PST
Shaddock, David M (CRD)
Sat, 14 Feb 1998 17:05:01 -0500
New Thread X-Sectioning Boards with Micro Vias
MICHAEL DODSON
Tue, 24 Feb 1998 12:16:29 +0000
Jeremy Drake
Wed, 25 Feb 1998 08:32:42 +0000
<>
Wed, 25 Feb 1998 08:34:06 EST
New Thread [ASSY} Prebake
BOB HAYNES
Tue, 24 Feb 1998 11:43:45 -0600
Kathy Palumbo
Tue, 24 Feb 1998 12:07:46 -0800
New Thread [ASSY} Prebake -Reply
JON MOORE
Fri, 27 Feb 1998 16:12:53 -0500
raymond lockshier
Fri, 27 Feb 1998 19:16:53 -0500
New Thread [CN] IPCchat session announcement
Christopher Rhodes
Fri, 13 Feb 1998 07:57:10 -0600
New Thread [Fwd: North Texas Chapter ~ IPC Designers Council Meeting March 5th @ 6:30PM]
Keith Larson
Sat, 28 Feb 1998 05:05:19 -0600
New Thread [TN] (Fwd) Gold Plated Edge Connectors
Rhoads, Randall E
Wed, 11 Feb 1998 11:51:08 -0500
New Thread [TN] Alpha Metals Ionograph 500M Chemical Verification
Dhawan, Ashok
Fri, 13 Feb 1998 09:39:01 -0700
New Thread [TN] Chip On Board
Dhawan, Ashok
Sun, 8 Feb 1998 06:59:05 -0700
New Thread [TN] Component Marking Ink
Dhawan, Ashok
Thu, 19 Feb 1998 16:31:00 -0700
New Thread [TN] F&K & ASM equipment feedback
Dhawan, Ashok
Sat, 14 Feb 1998 12:12:43 -0500
New Thread [TN] Gerber Software
Dhawan, Ashok
Fri, 13 Feb 1998 11:22:13 -0500
Dhawan, Ashok
Fri, 13 Feb 1998 14:32:24 -0700
New Thread [TN] Glue dispenser machine v/s stencil printing
Dhawan, Ashok
Tue, 24 Feb 1998 14:43:28 -0600
New Thread [TN] Gold for edge-board connectors thickness
Rhoads, Randall E
Wed, 11 Feb 1998 14:27:31 -0500
New Thread [TN] gold over entire board
Mauricio Castro
Thu, 19 Feb 1998 13:31:09 -0600
SMITH RUSSELL MSM PO US
Fri, 20 Feb 1998 04:27:00 +0100
New Thread [TN] Microsections
Richard Olsen
Wed, 25 Feb 1998 13:15:40 -0700
New Thread [TN] ORGANIC COATING(PRE-FLUX) THICKNESS MEASUREMEN
tgyee
Wed, 18 Feb 1998 11:55:14 PST
H H TONG
Wed, 18 Feb 1998 21:08:43 +0800
George Bokisa
Wed, 18 Feb 1998 09:37:34 -0800
Eltek Ltd. - Process Engineering
Wed, 18 Feb 1998 18:03:31 +0200
New Thread [TN] ORGANIC COATING(PRE-FLUX) THICKNESSMEASUREMEN
John Nelson
Wed, 18 Feb 1998 09:33:01 -0500
New Thread [TN] PCB warpage
tgyee
Wed, 18 Feb 1998 13:29:01 PST
New Thread [TN] Soldermask developing
Matthew Byrne
Tue, 10 Feb 1998 16:15:31 EST
John Haman Jr.
Tue, 10 Feb 1998 17:55:08 PST
<>
Wed, 11 Feb 1998 09:16:40 EST
Poulin, Michel
Wed, 11 Feb 1998 09:31:36 -0500
Ted Stern
Wed, 11 Feb 1998 10:42:11 -0800
Larry J. Fisher
Wed, 11 Feb 1998 23:28:44 EST
Matthew Byrne
Thu, 12 Feb 1998 16:42:10 EST
Mike Barmuta
Mon, 16 Feb 1998 11:42:38 -0800
New Thread [TN] Stencil Aperture Shapes -Reply
Dhawan, Ashok
Fri, 13 Feb 1998 16:22:05 -0700
New Thread [TN] v-score depanelling tool
Ziarek, Paul J
Tue, 24 Feb 1998 14:17:00 -0600
New Thread ] Design over 1GHz
Mitch Morey
Wed, 25 Feb 1998 10:48:57 -0800
Leslie O. Connally
Wed, 25 Feb 1998 15:16:59 -0800

ATOM RSS1 RSS2