Subject: | |
From: | |
Date: | Wed, 25 Sep 96 14:38:29 EST |
Content-Type: | text/plain |
Parts/Attachments: |
|
|
Since the effort is made to drill as many of the holes in the
primary drill operation as possible, we prefer that the drill
be sent as one file to reduce the number of steps in the
CAM operation. Non-plated holes are only drilled in a
secondary operation if they cannot be tented in the imaging
plating operation.
Don Bloye
PC World
______________________________ Reply Separator _________________________________
Subject: MISC: drill files 1 or 2
Author: [log in to unmask] at INET
Date: 9/25/96 2:04 PM
Hi - :)
What is prefered from the fabricators point of view:
One drill files containing both plated and non-plated holes?
or
Two drill files one plated the other non-plated?
Reasons?
---------------------------
John Laur
Rockwell Automation
Allen-Bradley Co Inc.
1201 South Second Street
Milwaukee, WI 53204
+1 414 382 2162 (fax)
+1 414 382 2393 (phone)
[log in to unmask]
---------------------------
***************************************************************************
* TechNet mail list is provided as a service by IPC using SmartList v3.05 *
***************************************************************************
* To unsubscribe from this list at any time, send a message to: *
* [log in to unmask] with <subject: unsubscribe> and no text. *
***************************************************************************
***************************************************************************
* TechNet mail list is provided as a service by IPC using SmartList v3.05 *
***************************************************************************
* To unsubscribe from this list at any time, send a message to: *
* [log in to unmask] with <subject: unsubscribe> and no text. *
***************************************************************************
|
|
|