Since the effort is made to drill as many of the holes in the primary drill operation as possible, we prefer that the drill be sent as one file to reduce the number of steps in the CAM operation. Non-plated holes are only drilled in a secondary operation if they cannot be tented in the imaging plating operation. Don Bloye PC World ______________________________ Reply Separator _________________________________ Subject: MISC: drill files 1 or 2 Author: [log in to unmask] at INET Date: 9/25/96 2:04 PM Hi - :) What is prefered from the fabricators point of view: One drill files containing both plated and non-plated holes? or Two drill files one plated the other non-plated? Reasons? --------------------------- John Laur Rockwell Automation Allen-Bradley Co Inc. 1201 South Second Street Milwaukee, WI 53204 +1 414 382 2162 (fax) +1 414 382 2393 (phone) [log in to unmask] --------------------------- *************************************************************************** * TechNet mail list is provided as a service by IPC using SmartList v3.05 * *************************************************************************** * To unsubscribe from this list at any time, send a message to: * * [log in to unmask] with <subject: unsubscribe> and no text. * *************************************************************************** *************************************************************************** * TechNet mail list is provided as a service by IPC using SmartList v3.05 * *************************************************************************** * To unsubscribe from this list at any time, send a message to: * * [log in to unmask] with <subject: unsubscribe> and no text. * ***************************************************************************