One of my biggest pet peeves is also having the schematic not completed
before the pcb layout begins. I installed a process where we have a
schematic review prior to layout on a completed schematic. Before that,
everyone was wondering why the layout took so long. Well let's see the
netlist changes 10 times so that equals 10 times of routing, rip-up, and
re-routing.
John Babcock, C.I.D.
PCB Designer III
www.spraycool.com
---------------------------------------------------------------------------------