DESIGNERCOUNCIL Archives

November 1999

DesignerCouncil@IPC.ORG

Options: Use Monospaced Font
Show Text Part by Default
Show All Mail Headers

Message: [<< First] [< Prev] [Next >] [Last >>]
Topic: [<< First] [< Prev] [Next >] [Last >>]
Author: [<< First] [< Prev] [Next >] [Last >>]

Print Reply
Subject:
From:
Greg Bordash <[log in to unmask]>
Reply To:
DesignerCouncil E-Mail Forum.
Date:
Fri, 12 Nov 1999 13:22:40 -0500
Content-Type:
text/plain
Parts/Attachments:
text/plain (130 lines)
> Greater Toronto Area IPC Designers Council Members Meeting
>     "The 1st and only Canadian Local Chapter"
>
> ****              Meeting Announcement                 ****
>
> Date:           Tuesday November 23, 1999
>
> Time:           From 6:00 pm sharp  until 8:30 pm.
>                    RSVP   with Ignatious Chong, Glenn Rutherford or Greg
> Bordash
>
> Topics:        EMI Compliance by Design
>                    Local chapter membership
>                    Future locations & programs.
>
>
> Everything a designer needs to know about EMI Compliance by design and how
> to
> provide a successful platform for today's electronic devices.  This
> discussion will go through
> the processes that your product must go through to be compliant by the
> regulatory agencies.
> This is a must attend session for designers needing answers to meeting
> compliance issues for
> their products.  Are you interested in building a better product ?  Then
> check out this
> presentation for answers to your EMI questions and compliance issues.
>
>
> Brief UltraTech Engineering Labs Inc. Introduction
> UltraTech/Industry capabilities
>
> The basics that a designer need to understand in order to design product
> compliance into a unit will be presented in a condensed session.  PCB
> design, layout and integration into a chassis housing will be discussed
> and
> the impact of the design consideration for regulatory compliance for the
> product.  There is no point to designing a new product if it cannot meet
> the
> regulatory requirements for EMC, safety or telecommunications and
> therefore,
> cannot be sold.  A successful design is one which  meets the functional,
> cost and regulatory requirements all at the same time.  Most designers
> excel
> at the first two.  A good designer meets all three consistently.
>
> Guest speaker:  Victor Kee P.Eng
>
> About the Speaker;
>
> Victor Kee is one of the principals at Ultratech Engineering Labs Inc; a
> company dedicated to providing manufacturers with worldwide product
> approval
> and compliance services.  With over 10 years of experience in providing
> EMC
> solutions to non-complying products, Victor Kee has amassed considerable
> hand-on experience in what makes a product comply and most importantly,
> what
> doesn't.
>
> UltraTech Engineering Labs Inc.
> Ultratech's facility  is situated in Oakville Ontario and comprises a
> 13,000 sq. ft
> state-of-the art testing and consulting facility.
> For more information on the company, visit http://www.ultratech-labs.com.
>
>
> Location:      ATI Technologies Inc.
>                    75 Tiverton Court
>                    Markham, Ontario, Canada
>                    2nd floor meeting room. Follow the signs from
> reception.
>                    ( Note that you must sign-in at the front desk.)
>
> Directions:   FROM  Hwy 404 & Hwy 7
>
>                    Follow Hwy 7 East of Hwy 404 to Allstate Parkway. Turn
> left (North)
>                    ( Note that Allstate Parkway is 1st intersection East
> of Hwy 404.)
>                    Proceed on Allstate Parkway to Tiverton Court. Turn
> left (West)
>                    ( Note that Tiverton Court is the 2nd street on your
> left at the top of
>                     Allstate Parkway past the second stop sign.)
>                    Proceed to the end of Tiverton Court to the ATI
> building parking.
>
> **************************************************************************
> ****
>
>                    FROM  Hwy 401 & Hwy 404( Don Valley Parkway )
>
>                    Follow Hwy 404 North to Hwy 7 East exit.
>                    Follow Hwy 7 East of Hwy 404 to Allstate Parkway. Turn
> left (North)
>                    ( Note that Allstate Parkway is 1st intersection East
> of Hwy 404.)
>                    Proceed on Allstate Parkway to Tiverton Court. Turn
> left (West)
>                    ( Note that Tiverton Court is the 2nd street on your
> left at the top of
>                     Allstate Parkway past the second stop sign.)
>                    Proceed to the end of Tiverton Court to the ATI
> building parking.
>
> **************************************************************************
> ****
>
> Hope to see you there !!
>
> For more info on becoming an IPC Designer Council Member contact the IPC
> directly @
> http://ipc.org  or one of the members listed below.
>
> Greg Bordash -     President, Greater Toronto Area IPC Designer Council
> (905)882-2600 x8370    [log in to unmask]
> Ignatious Chong -  Vice President, Greater Toronto Area IPC Designer
> Council
> (416)448-5048      [log in to unmask]
> Glenn Rutherford - Treasurer, Greater Toronto Area IPC Designer Council
> (905)843-1384      [log in to unmask]
>
> PS. Pass this along to anyone interested in attending or becoming a
> member.
>       If you do not wish to be on this distribution list please let us
> know.
> **************************************************************************
> *****************

ATOM RSS1 RSS2