Eric and all,
How about tracking the yield through the process/machine over time -
per shift, daily, weekly, whatever makes sense? Example, I have 95% yield
so I know for every 100 scheduled/produced I can expect, on average, to get
95 good ones to go to the next step. I can't tell you which ones are good
until I measure/inspect something.
I think of process capability (or the index), Cp or Cpk, as a means
to compare the ability of a process/machine to produce something within
tolerance. It tells me whether I will go broke trying to make something.
Hans
~~~~~~~~
Hans M. Hinners WR-ALC/LYPME Bldg.
640
Materials Engineer 380 Second
Street, Suite 104
Manufacturing Eng. Sec. Robins AFB GA
31098-1638
912-926-1970 (Voice) 468 - 1970 (DSN) 912-926-7974 (Fax)
[log in to unmask]
>
> What is the best way to determine the process capability of a machine in
> terms of defective units produced? How can I say that a certain machine is
> capable only of producing a certain no of good units everytime it is being
> run? Any inputs will be highly appreciated.
>
> Eric
> FAAI
##############################################################
TechNet Mail List provided as a free service by IPC using LISTSERV 1.8c
##############################################################
To subscribe/unsubscribe, send a message to [log in to unmask] with following text in
the body:
To subscribe: SUBSCRIBE TECHNET <your full name>
To unsubscribe: SIGNOFF TECHNET
##############################################################
Please visit IPC web site (http://www.ipc.org/html/forum.htm) for additional
information.
If you need assistance - contact Gayatri Sardeshpande at [log in to unmask] or
847-509-9700 ext.5365
##############################################################
|
|
|