> To all...
>
> A few days ago, we had a lot of activity related to pwb design
> cycle/requirements.
> I've been having an ongoing battle with those, that have no idea what we
> do, but
> are experts in what we do, you all know what I mean. I keep hearing that
> "These types of designs are completed much quicker and cheaper by other
> companies? Why can't you be competitive?" When I question them on their
> source of information, it's usually, "My project buddy at Company ABC said
> so?"
> When I ask for the details, such as size of board, number of layers,
> technologies,
> etc., it becomes very evident that we are comparing apples to bananas,
> pears to
> grapes, you know where we're going with this. When I talk to my
> counterparts or
> the "designers in the trenches", I hear that they are experiencing similar
>
> comparisons in their workplace. So, it seems as if we are trying to
> justify our
> hours and calendar time against a nonexistent target...Great for the
> bean-counters
> that are kicking the c##p out of us, but not really fair to the guys/gals
> doing the
> REAL work.
>
> Sooooo, maybe it's time to get together and collect some HARD, REAL data
> on
> what we do, so the next time the hot shots try to blow smoke up our butts,
> we'll
> have facts, not fictions, to justify our design cycle. I'm including a
> list of design
> parameters, similar to those listed in the e-mails, that will allow us to
> INTELLIGENTLY
> evaluate what it takes to do a design. Obviously, this will not be true
> for all designs,
> but at least it will give us a general idea of what we did, with what we
> were given,
> what we outputted and what kind of time it took for a family of SIMILAR
> designs.
>
> Of course, we might have those that will, as one commented, toot toot toot
> their
> horn with some exaggeration. However, if enough replies come in, one can
> throw
> out the high's and low's and go with the average. At least it can be a
> starting point.
>
> So, if you want to fill out the survey and send it directly back to me, I
> will try to put
> it in a form that makes sense and send it back to TechNet for all to
> review. If I have
> missed any real important items, a subsequent survey can be initiated. If
> this
> works and the net finds it helpful, then other families of surfaces can be
> surveyed.
> Thanks in advance!!
>
>
>
>
> NOTE:
> For this first cut, please only submit designs that are between
> 9.3 x 6.7 (approx. VME) to 9.3 x 10.2
>
>
EXAMPLE YOUR
DESIGN
---------------
----------------------
> Classified/Board Class 3
> Type per IPC-2221/2222 /Type 5
>
> Size 9.25 x 10.18
>
> Type of Design Digital/TTL/ECL/SMT
> Thermal Constraints
>
> Number of Components
> Microcircuits 50
> Discretes 350
> Other Uniques None
>
> Type of Microcircuits 132&160&224 Pin
> Gate Arrays/24 Pin Quad
> Flatpacks/16 & 24 Pin Flatpacks
>
> Type/Pin Count of 280 Pin SMT/2 @
> Connectors 20 Pin SMT
>
> No./Description of Layers 15 Total Layers
> Top/Bottom Comps/Pads/
> Signal (See Below)
> Critical 2 for TTL/2 for ECL
> Non-Critical Routed on TTL/ECL
> Planes 9
> Split Planes None
>
> No. of Pins/Nets 2250/420
>
> Trace/Space (Majority) .007/.0055
>
> % of Critical Routes 50%
>
> % of Routing Technique
> Manual 100%
> Autoroute None
>
> Avg. No. of Net List/ 4/3/5
> Placement/Routing
> Iterations after Rel.
>
>
>
>
> Type of Routing o Impedance
> o Matched Lengths
> for True & Comps
> o Critical Hi-Sp Clks
> o Termination Res.
> on all diff. pairs
> o Min. ECL/TTL Shadowing
> on all layers
> o Min. Crosstalk
> o Stitching of Ground
> Planes to Reduce
> Return Current Path
>
> Tasks Included in o Generate Land Patterns
> Design Cycle o Gen. Parts List from
> Elec. Schematic
> o Gen. Placement from
> Elec. Prelim. Layout
> o Gen. Thermal Data
> o Route Crit. Signal/
> Review by Elec./Reroute
> as required
> o Same as above for
> remaining routes
> o Gen. DXF Files to
> Dft. for PWB/ASSY Dwgs
> o Gen. Gerber files for
> Phototooling
> o Check PWB Dwg vs. Film
> o Check ASSY Dwg vs. PL
> o Gen. Cam Aids
> o Rel all Dwgs/Files to
> Config. Management
>
> Design Cycle (Working Days) 90
>
> Cal. Time - Including Changes 130
> in Rel. Data/Checking/Review-
> ing by Outside Disciplines/Stop
> Work by Project Orders
>
> Comments o Changes from top
> H'sink to Backplate
> o Stopped Work/2 months
> Final Pin Outs of 132A
> Not Defined from Vendor
> **************************************************************************
> ****************************
>
> Complete if you off-load designs to design services:
>
> Data Give to Outside o Statement of Work
> Design Service o Critical Design Ground
> Rules
> o Placed/Net List
>
> Data Received o Routed Electronic
> Data Base of all Files,
> Compatible to our Sys.
> o DXF files for Drafting or
> PWB/ASSY Dwgs. on
> our Format
>
> Days Saved by Off-Loading o Add 1-2 Weeks to Cycle
> to Design Service
>
>
>
>
>
>
################################################################
TechNet E-Mail Forum provided as a free service by IPC using LISTSERV 1.8c
################################################################
To subscribe/unsubscribe, send a message to [log in to unmask] with following text in the body:
To subscribe: SUBSCRIBE TechNet <your full name>
To unsubscribe: SIGNOFF TechNet
################################################################
Please visit IPC's web site (http://www.ipc.org) "On-Line Services" section for additional information.
For technical support contact Hugo Scaramuzza at [log in to unmask] or 847-509-9700 ext.312
################################################################
|