Subject: | |
From: | |
Reply To: | |
Date: | Tue, 21 Jul 1998 10:00:35 -0400 |
Content-Type: | text/plain |
Parts/Attachments: |
|
|
I would like to first take this opportunity to thank everyone that has
taken the time to assist me in my initial enquires. I have gathered
alot of good content from all of you, and for that I grateful. Before
formalizing the supplier survey, I would like to throw out a rough draft
for last minute suggestions. If I have managed to overlook anything,
please let me know. In closing, I would like to thank everyone for
their participation.
Company Name
Company Address1
Company Address2
Country
Zip Code
Telecommunications
Telephone
Fax Number
Modem Number
Email Address
Web Site Address
Personnel
CEO
Quality Manager
Engineering Manager
Sales Manager
No of Employees
# of Purchasing Personnel
# of Engineering Personnel
# of Quality Personnel
# of Production Personnel
# of Production Control/Distribution Personnel
# of Tool Making/Maintenance Personnel
# of Administrative Personnel
# of Others
Manufacturing Focus
Min # of Layers
Max # of Layers
Min Line Width (internal)
Min Line Width (external)
Line-to-Line Clearance (internal)
Line-to-Line Clearance (external)
Line-to-Land Clearance (internal)
Line-to-Land Clearance (external)
Min. Hole Size
Min. SMT Pitch
Max. Panel Size
Aspect Ratio
Product Mix
S/S (% of Capacity)
D/S (% of Capacity)
Multilayer 4-6 layers (% of Capacity)
Multilayer 8 + layers (% of Capacity)
Flex & Rigid Flex (% of Capacity)
Basic Plant Data
No. of Shifts
# of Hours per Shift
# of Work Days/Year
# Work Days/Week
# of Holidays and Vacations Days
Total Sq' of Capacity per day
Total SQ' of Capacity per Month
Manufacturing area/Sq Feet
Current % of Capacity being Used
Sq Footage of Facility
Plant Character (High Volume, Medium Volume, Low Volume, Prototype)
Average Leadtime (Production Parts)
Average Leadtime (First Article)
Customer Approvals
Capacity Expansion Plans
Current Capacity
6 Month Plan
12 Month Plan
24 Month Plan
Design Capabilities
Computer Aided Engineering & Equip
Computer Aided Design & Equip
Laser Plotter
Electrical Testing
Dedicated Test Fixture
Automatic Test Fixture
Special Technologies
Blind Vias
Buried Vias
Microvia Rigid
Microvia Flex
Microvia-Laser
Microvia-Plasma
Photovia
Carbon Ink
COB
BGA
Backpanel
Copper Invar
Flexible
Flex-Rigid
IVH
Hot Air Level
Hot Oil Level
RF Microwave
Thin Core
Processes
Additive
Semi-Additive
Subtractive
Thin Film
Thin Foil
Thick Film
Base Materials
Phenolic
Glass Paper
Epoxy Paper
Epoxy Glass
Polyimide Composite
Polyimide Glass
Cyanide Ester
Flex Materials
Teflon
BT Epoxy
PPE
High performance epoxy
PTFE
Thermount
RCC
Polyimide
Copper-Invar-Copper
Copper-Moly-Copper
Copper-Carbon-Copper
Silicon/Glass
Polyphenylene Ether/Glass
Kevlar
Aramid
Insulated Metal Substrate
Soldermask
Dry Film
Image Transfer
LPI
Drilling
Small Hole
Laser Drill
Hard Tooling
Blanking
Pierce
Routing
NC Route
Pin Route
Perforate
Laser Score
V-Score
Shear Only
Electrical Test
Dedicated
Clamshell
Continuity
Flying Probe
Net List
Coatings
Conformal
Organic
Paraxialine
Solder
OSP
Plating
Copper
Tin
Tin/Lead
Tin/Nickel
Tin/Nickel Alloy
Nick/Gold (Hard)
Nick/Gold (Immersion)
Nick/Rodium
Full Body Nickel
Full Body Gold
Selective Plating
Palladium
Palladium-Alloy
Silver
Bismuth
Finishes
Electroless Nickel Gold
Immersion Silver
Electroless Nickel
Immersion Gold
Electroless Palladium
Brushed Tin Lead
Electroless Tin
Solder Fused
Flux
Roll Solder
Tin/Lead Fused
Triazode
Entek
UL Approvals
UL Single Sided
UL Double Sided
UL Multilayer
Approv # of Layers
International Approvals
CSA
IECQ
ISO 9001
ISO 9002
ISO 9003
ISO 14000
QS-9000
ESA (European Space Agency)
VDE
Raw Material Data
Thin Laminate Suppliers
Thick Laminate Suppliers
Prepreg Supplier
Etchant Supplier
Soldermask Supplier
Basic Equipment Data
AOI Inspection Equipment
In-House Lamination
Finanicial Data
Terms: Net Days
Currency:
Dun & Bradstreet #
Years in Business
Annual Revenues
Best Regards
################################################################
TechNet E-Mail Forum provided as a free service by IPC using LISTSERV 1.8c
################################################################
To subscribe/unsubscribe, send a message to [log in to unmask] with following text in the body:
To subscribe: SUBSCRIBE TechNet <your full name>
To unsubscribe: SIGNOFF TechNet
################################################################
Please visit IPC's web site (http://www.ipc.org) "On-Line Services" section for additional information.
For technical support contact Hugo Scaramuzza at [log in to unmask] or 847-509-9700 ext.312
################################################################
|
|
|