TECHNET Archives

December 2002

TechNet@IPC.ORG

Options: Use Monospaced Font
Show Text Part by Default
Show All Mail Headers

Message: [<< First] [< Prev] [Next >] [Last >>]
Topic: [<< First] [< Prev] [Next >] [Last >>]
Author: [<< First] [< Prev] [Next >] [Last >>]

Print Reply
Subject:
From:
Kathy Kuhlow <[log in to unmask]>
Reply To:
TechNet E-Mail Forum.
Date:
Mon, 2 Dec 2002 08:13:38 -0600
Content-Type:
multipart/mixed
Parts/Attachments:
text/plain (1288 bytes) , TEXT.htm (1730 bytes)
I think a lot of it depends on the part, any presoldering requirements (prepping), operator skills, soldering equipment, etc...  When I have tried to time and balance manual processing I would do a time study on say 10-20 pieces completed per operator skill level.  I normally used 4-6 people.  Some would be the entry level operator, some would be the average operator, and some would be the advanced operator. You can then use this as an average operator time.  Then I would start looking at where the time is being spent and why.   

Kathy

---------------------------------------------------
Technet Mail List provided as a free service by IPC using LISTSERV 1.8e
To unsubscribe, send a message to [log in to unmask] with following text in
the BODY (NOT the subject field): SIGNOFF Technet
To temporarily halt or (re-start) delivery of Technet send e-mail to [log in to unmask]: SET Technet NOMAIL or (MAIL)
To receive ONE mailing per day of all the posts: send e-mail to [log in to unmask]: SET Technet Digest
Search the archives of previous posts at: http://listserv.ipc.org/archives
Please visit IPC web site http://www.ipc.org/html/forum.htm for additional
information, or contact Keach Sasamori at [log in to unmask] or 847-509-9700 ext.5315
-----------------------------------------------------



<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN"> <HTML><HEAD> <META http-equiv=Content-Type content="text/html; charset=iso-8859-1"> <META content="MSHTML 6.00.2715.400" name=GENERATOR></HEAD> <BODY style="MARGIN-TOP: 2px; FONT: 8pt MS Sans Serif; MARGIN-LEFT: 2px"> <DIV><FONT size=1>I think a lot of it depends on the part, any presoldering requirements (prepping), operator skills, soldering equipment, etc...&nbsp; When I have tried to time and balance manual processing I&nbsp;would do a time study on say 10-20 pieces completed per operator skill level.&nbsp; I normally used 4-6 people.&nbsp; Some would be the entry level operator, some would be the average operator, and some would be the advanced operator.&nbsp;You can then use this as an average operator time.&nbsp;&nbsp;Then I would start looking at where the time is being spent and why.&nbsp;&nbsp;&nbsp;</FONT></DIV> <DIV><FONT size=1></FONT>&nbsp;</DIV> <DIV><FONT size=1>Kathy</FONT></DIV> <DIV><BR><BR></DIV></BODY></HTML> --------------------------------------------------- Technet Mail List provided as a free service by IPC using LISTSERV 1.8e To unsubscribe, send a message to [log in to unmask] with following text in the BODY (NOT the subject field): SIGNOFF Technet To temporarily halt or (re-start) delivery of Technet send e-mail to [log in to unmask]: SET Technet NOMAIL or (MAIL) To receive ONE mailing per day of all the posts: send e-mail to [log in to unmask]: SET Technet Digest Search the archives of previous posts at: http://listserv.ipc.org/archives Please visit IPC web site http://www.ipc.org/html/forum.htm for additional information, or contact Keach Sasamori at [log in to unmask] or 847-509-9700 ext.5315 -----------------------------------------------------

ATOM RSS1 RSS2