TECHNET Archives

November 2001

TechNet@IPC.ORG

Options: Use Monospaced Font
Show Text Part by Default
Show All Mail Headers

Message: [<< First] [< Prev] [Next >] [Last >>]
Topic: [<< First] [< Prev] [Next >] [Last >>]
Author: [<< First] [< Prev] [Next >] [Last >>]

Print Reply
Subject:
From:
Jeff Ferry <[log in to unmask]>
Reply To:
TechNet E-Mail Forum.
Date:
Fri, 16 Nov 2001 08:53:36 -0500
Content-Type:
text/plain
Parts/Attachments:
text/plain (84 lines)
Peter,

As MoonMan says, this type of problem is preventable by using proper DFM
procedures, but then folks in the repair business like us would have nothing
to do!

Removing warp is actually rather simple, and is an IPC documented procedure.
I've attached a link to our online procedure with more details. We find that
about 80% of the time we can remove warp and bring bare, or assembled,
boards into spec. However, sometimes the inherent stress in the remaining
20% is just too great to overcome.

Bow and Twist Repair Procedure
http://www.circuittechctr.com/guides/3-2.htm

Jeff Ferry
CEO
Circuit Technology Center, Inc.
www.circuittechctr.com
[log in to unmask]
978-374-5000

Sign up for our Free E-mail Newsletter at:
www.circuittechctr.com/general/free_email.htm



-----Original Message-----
From: <Peter George Duncan> [mailto:[log in to unmask]]
Sent: Thursday, November 15, 2001 9:11 PM
To: [log in to unmask]
Subject: [TN] Board Warp


Hi, All,

We have received a number of 12 layer ENIG-finished MLB's with blind via
hole groups, and which are destined to have BGA's (1.27mm pitch) populated
onto them. The boards measure 8.2" x 5.7" and they are warped to the extent
of one corner being raised by between 1.5mm and about 3mm. The axis of the
warp is the long side of a triangle whose other two sides measure about 5.7
x 5.7.

In this age of sensitive boards, does a technology or technique exist for
straightening the boards back into spec - they are class 3 boards - or is
this an area where angels still fear to tread?

The boards are desperately urgent, which is why I'm asking this rather than
simply rejecting them and having them re-made (which takes about a month).

TIA for any help.

Peter Duncan

[This e-mail is confidential and may also be privileged. If you are not the
intended recipient, please delete it and notify us immediately; you should
not copy or use it for any purpose, nor disclose its contents to any other
person. Thank you.]

----------------------------------------------------------------------------
-----
Technet Mail List provided as a free service by IPC using LISTSERV 1.8d
To unsubscribe, send a message to [log in to unmask] with following text in
the BODY (NOT the subject field): SIGNOFF Technet
To temporarily halt delivery of Technet send the following message: SET
Technet NOMAIL
Search previous postings at: www.ipc.org > On-Line Resources & Databases >
E-mail Archives
Please visit IPC web site (http://www.ipc.org/html/forum.htm) for additional
information, or contact Keach Sasamori at [log in to unmask] or 847-509-9700
ext.5315
----------------------------------------------------------------------------
-----

---------------------------------------------------------------------------------
Technet Mail List provided as a free service by IPC using LISTSERV 1.8d
To unsubscribe, send a message to [log in to unmask] with following text in
the BODY (NOT the subject field): SIGNOFF Technet
To temporarily halt delivery of Technet send the following message: SET Technet NOMAIL
Search previous postings at: www.ipc.org > On-Line Resources & Databases > E-mail Archives
Please visit IPC web site (http://www.ipc.org/html/forum.htm) for additional
information, or contact Keach Sasamori at [log in to unmask] or 847-509-9700 ext.5315
---------------------------------------------------------------------------------

ATOM RSS1 RSS2