If baking is required, mandatory for polyimide or customer directed...
We bake at 125C for 3-4hrs then:
1. process through automated soldering (wave or reflow) within 24 hours
2. hand solder within 96 hrs
3. place in a dry box until needed
4. If time out of oven (not in dry box) exceeds req. 1 or 2 we rebake.
We follow the same time guidelines for usage for moisture sensitive parts but
bake per manufacturer's guidelines/moisture sensitivity indicated on the
packaging. (example: partial tray of QFPs comes in opened => questionable
moisture level => bake and place in dry box)
Regards,
Mike Sewell
##############################################################
TechNet Mail List provided as a free service by IPC using LISTSERV 1.8c
##############################################################
To subscribe/unsubscribe, send a message to [log in to unmask] with following text in
the body:
To subscribe: SUBSCRIBE TECHNET <your full name>
To unsubscribe: SIGNOFF TECHNET
##############################################################
Please visit IPC web site (http://www.ipc.org/html/forum.htm) for additional
information.
If you need assistance - contact Keach Sasamori at [log in to unmask] or
847-509-9700 ext.5315
##############################################################