I personally feel that the second table obviates the need for re-visiting
the old one.
Lionel.
From: John Perry <[log in to unmask]>@ipc.org on 10/21/2003 03:54 PM EST
Please respond to "(Combined Forum of D-33a and 7-31a Subcommittees)"
<[log in to unmask]>
Sent by: IPC-600-6012 Mail Forum <[log in to unmask]>
To: [log in to unmask]
cc:
Subject: [IPC-600-6012] Teleconference on IPC External Copper Foil
Minimums
Colleagues,
One of the final hurdles in the completion of Revision B for the IPC-6012
Qualification and Performance Specification for Rigid Printed Boards is the
updating of Table 3-8, External Conductor Thickness after Plating.
A proposal was made at Expo 2003 to rebuild the table using Maximum
Variable Processing Allowance Reductions, thereby increasing some of the
minimum thickness requirements.? These new thickness requirements are based
on changes to the existing processing allowance reductions, which were
extracted from the table earlier this year.? Agreement could not be reached
in the time allotted but several questions were posed, including:
Is there still a need for Table 3-8 when Table 3-2 provides minimum
surface/hole plating values?
In the case of Table 3-8, what if all weights used the same processing
allowance?
We will be holding a teleconference to continue discussion on this table on
Wednesday, October 29th at 2PM Eastern, 11AM Pacific.? I would like for us
to use this forum as a means to submit comments between now and then, at
which time I will compile all the comments and make them available for the
teleconference.
To access the teleconference, please dial 1-620-584-8200 and enter the
passcode of 3366# when prompted by the audio beep.
To access the Table 3-8 proposal, visit the IPC Committee Home Page,
located at
http://www.ipc.org/Committeepage.asp. The IPC-6012B External Copper Foil
Table Proposal is available in Excel format.
When accessing this page, please select the "+" button to the left of the
D-30 Rigid Printed Board Committee link, which expands to all the task
group links below, and then select the D-33a Rigid Printed Board
Performance Specification Task Group link.? Once you are at the web page
for this task group, select the "Draft" link and you can download the Excel
file.
If you have problems accessing the file please contact me at [log in to unmask]
and I will send you a copy outside of this e-mail forum.
Regards,
John Perry
Technical Project Manager
IPC
[log in to unmask]
1-847-790-5318
Visit www.ipc.org/annualmeeting?for Tech session and standards committee
meeting dates and times
|
|
|